Laserfiche WebLink
June 15, 2017 C-1994-082/Yoast Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 6 <br /> <br /> <br />Pond 14 was stable with no discharge at the time of the inspection. No issues were noted with the embankments <br />and the primary discharge was functioning as designed. <br /> <br />Pond 009 was stable with no discharge at the time of the inspection. No issues were noted with the embankments <br />or spillways. <br /> Pond 009 Pond 013 <br /> Pond 014 Pond 012 <br /> <br />Permanent drainages were stable with no issues noted during the inspection. Drainages YPM-16, 10, 7, 19, 1-3, <br />18, 4, 4-2, and 6-3 were observed to be stable and functioning as designed with no problems noted. <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> <br />The roads throughout the site were dry and stable with no problems noted. All permanent roads were accessible. <br /> <br />REVEGETATION – Rule 4.15 Vegetative Cover; Timing: <br />