Laserfiche WebLink
Permit M1990-057 5 <br /> Leadville Mill,Union Milling Company,LLC <br /> June 16,2017 <br /> Table 3: Perched Aquifer in TSF (mg/L) <br /> Analyte 2016- 2016- 2017 <br /> Q3 Q4 Q1 <br /> m /L m /L m /L m /L m /L m /L m /L m /L <br /> Method:200.8 ICP/MS,Protocol:EPA <br /> Antimony ND ND <br /> Arsenic 0.009 0.007 <br /> Barium 0.270 0.270 <br /> Beryllium 0.001 0.001 TSF <br /> Cadmium 0.005 0.002 SNOW <br /> Chromium 0.008 0.007 COVERED <br /> Cobalt 0.004 0.003 NO <br /> Copper 0.074 0.025 ACCESS <br /> Lead 0.085 0.066 <br /> Manganese 0.550 0.470 <br /> Molybdenum ND ND <br /> Nickel 0.015 0.012 <br /> Selenium ND ND <br /> Silver 0.004 0.002 <br /> Thallium ND ND <br /> Uranium 0.007 0.002 <br /> Vanadium 0.017 0.011 <br /> Zinc 1 0.290 1 0.190 <br /> Method:9012A Total and/or Amenable Protocol:SW846 <br /> Cyanide I ND ND <br /> ND=Non-Detectable <br /> 3. TSF Construction. Delays associated with the final construction and operation of the <br /> mill continue to be influenced by poor metals market conditions. Meetings with potential <br /> investors were not successful in 2016 and we were not able to secure financing. We <br /> continue to meet with interested parties and while hopeful that we will receive funding to <br /> complete the project, it is not likely that this will happen to support construction activities <br /> for the 2017 building season. <br /> 4. Si na e. Permanent mill permit identification signs (metal-style) were maintained on <br /> the main gate to the facility and on the mill building, identifying the UMC and our permit <br /> number. <br /> 5. Fencin-g. The barbed wire property boundary fence was repaired in various areas <br /> where it was broken by wildlife. Fence maintenance is required by our Lake County <br /> Conditional Use Permit. <br /> 6. Permit Boundary. Permit boundary stakes were maintained as required. <br /> 7. Mill Facility Activity. The mill buildings and equipment were maintained in preparation <br /> of reconditioning and restarting the mill. <br /> 8. Sediment Control. Sediment control measures were performed on an as needed basis <br /> (temporary silt fence construction around the ore stockpiles, temporary historic tailings <br />