My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-19_REPORT - M2009093
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2009093
>
2017-06-19_REPORT - M2009093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2020 4:30:13 PM
Creation date
6/20/2017 7:45:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009093
IBM Index Class Name
REPORT
Doc Date
6/19/2017
Doc Name
Annual Fee/Report/Map
From
Theisen Mineral
To
DRMS
Annual Report Year
2017
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Pagel"ff <br /> 12. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres �� Total acres Total acres <br /> backfilled: D seeded w/ w/topsoil C) mulched w/ <br /> ajq)royed mix: laced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: v fertilized w/ v replacement 0 rate(tons/ac): U <br /> vd fertilizer. depth(in.): <br /> Seed a Fertilizer a ,� Mulch <br /> application ` vl application application <br /> method: `' method: C GL 9 T method: C ct y fi <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N! <br /> If"YES",indicate the weed species,control area,control type,application rate and treatment date on the repo map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? YES NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of die- to <br /> Engineer(Well Permit,S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO / <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO <br /> 18. is your financial warranty value sufficient to cover the cost to complete reclamation? 16Ti NO N/A <br /> 19. Is your basis for legal right to enter still valid? (YO NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO aN/ <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(CILS,34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.