Laserfiche WebLink
Groundwater Monitoring Evaluation <br /> Connell Resources-Timnath Pit <br /> Page 2 <br /> Terracon Project No. 20985110 <br /> The groundwater levels appear to be experiencing more fluctuation during the last month's monitoring <br /> episodes. It should be noted that mining operations along with dewatering efforts have taken place <br /> most recently which could be contributing to the fluctuating groundwater levels as observed in <br /> Piezometers 1 through 9. <br /> Notes: (*) Area for piezometers #6-9 was inaccessible due to the entrance gates being locked. <br /> (**) Piezometer was inaccessible due to the on-going mining operations. <br /> Terracon will continue to monitor the piezometers indefinitely until further notice as requested. If you <br /> have any questions or require further information, please feel free to contact us at your convenience. <br /> Sincerely, <br /> TER CON <br /> David A. Richer, P.E. <br /> Geotechnical Engineer/Department Manager <br /> Copies to: Addressee (3) <br /> Tuttle-Applegate, Inc. (1): Mr. David Jones <br />