Laserfiche WebLink
Groundwater Monitoring Evaluation <br /> Connell Resources-Timnath Pit <br /> Page 2 <br /> Terracon Project No. 20985110 <br /> Piezometer #3 was redrilled on January 17, 2000. (*)Area for piezometers #6-9 was inaccessible due <br /> to the entrance gates being locked. (**) Piezometer#5 was inaccessible due to land-moving activity by <br /> Connell Resources. Terracon will continue to monitor the piezometers indefinitely until further notice as <br /> requested. If you have any questions or require further information, please feel free to contact us at <br /> your convenience. <br /> Sincerely, <br /> TER CONK <br /> David A. Richer, P.E. <br /> Geotechnical Engineer/Department Manager <br /> Copies to: Addressee (3) <br /> Tuttle-Applegate, Inc. (1), Mr. David Jones <br />