My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-19_REVISION - M1999050
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999050
>
2017-06-19_REVISION - M1999050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:07 PM
Creation date
6/19/2017 3:01:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999050
IBM Index Class Name
REVISION
Doc Date
6/19/2017
Doc Name
Request for Technical Revision
From
Kevin Anderson
To
DRMS
Type & Sequence
TR4
Email Name
JLE
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 4, 2000 <br /> Irerracon <br /> Connell Resources, Inc. 301 N.Howes o P.O.Box 503 <br /> 4305 East Harmony Road Fort Collins,Colorado 80521-0503 <br /> Fort Collins, Colorado 80525 (970)484-0359 Fax:(970)484-0454 <br /> Attn: Mr. William Welch <br /> Re: Proposed Timnath - Connell Pit <br /> Weekly Groundwater Monitoring <br /> Terracon Project No. 20985110 <br /> Dear Mr. Welch, <br /> On April 7, April 8, and October 4, 1999, Terracon installed nine piezometer wells for the above <br /> referenced project. Terracon monitored groundwater levels on a weekly basis through July 9, and then <br /> on a semi-monthly basis through October for Monitoring Well Nos. 1 through 5. After Monitoring Well <br /> Nos. 6 through 9 were installed in October of 1999, Terracon has been monitoring the wells on a semi- <br /> monthly basis. The following table shows the depth of where groundwater was measured from the <br /> ground surface elevations for Monitoring Well Nos. 1 through 9, starting on October 12, 1999. <br /> Monitoring Depth of Groundwater Below Ground Surface(ft) <br /> Date 1 2 3 4 5 6 7 8 9 <br /> i <br /> October 12, 1999 3.6 5.2 5.1 4.6 3.6 5.0 4.3 2.3 4.9 <br /> October 26, 1999 3.6 5.3 5.1 4.7 3.6 5.3 4.2 2.6 5.2 <br /> I <br /> November 17, 1999 3.4 5.7 5.3 5.1 3.8 5.3 4.8 3.0 5.5 <br /> November 29, 1999 3.4 5.6 5.4 5.1 3.7 5.5 4.8 2.8 5.6 <br /> I <br /> December 14, 1999 3.5 5.5 5.3 5.2 3.5 5.4 4.6 1 2.5 5.4 <br /> I <br /> January 4, 2000 3.3 5.1 - 4.8 3.3 4.8 4.6 2.8 4.3 <br /> On January 4, 2000, Well No. 3 could not be found. It appears this well may have been destroyed <br /> during the plowing of the field. Terracon will continue to monitor the piezometers indefinitely until further <br /> notice as requested. If you have any questions or require further information, please feel free to <br /> contact us at your convenience. <br /> Sincerely, <br /> TER CON <br /> avid A. Richer, P.E. <br /> Geotechnical Engineer/Department Manager <br /> Copies to: Addressee (3) <br /> Tuttle-Applegate, Inc. (1): Mr. David Jones <br /> Arizona ■ Arkansas ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa ■ Kansas IN Kentucky ■ Minnesota ■ Missouri ■ Montana <br /> Nebraska ■ Nevada ■ New Mexico ■ Oklahoma Is Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming <br /> Quality Engineering Since 1965 <br />
The URL can be used to link to this page
Your browser does not support the video tag.