[I OPERATIONS PLAID — MINE FACILITIES (RULE 2.05) II
<br />Pages 2.05-11.1, 11.2, 32.4,
<br />32.5, 32.6, 32.7, 33, 74.2,
<br />84.5, 84.6, 84.7, 84.8, 84.9,
<br />84.10, 84.11, 84.12, 84.13,
<br />84.14, 84.15, 97.6, 97.7,
<br />97.8. and 129
<br />EXHIBITS
<br />Revised operations and
<br />reclamation plan text describing
<br />SWMD Thickener Underflow
<br />Borehole and Pipeline plans
<br />Replace Pages 2.05-11.1, 11.2,
<br />32.4, 32.5, 32.6, 33, 74.2, 84.5,
<br />84.6, 84.7, 84.8, 84.9, 84.10,
<br />84.11, 84.12, 84.13, 84.14, 97.6,
<br />97.7, and 97.8, and insert new
<br />pates 32.7 and 84.15 in Volume I
<br />Exhibit 49S — 6RT, 7RT, I Design drawings for I SW & 12- 1 Insert in Exhibit 49S in Volume
<br />2MN,12-Left and SW -MD
<br />Left Thickener Underflow
<br />II -E
<br />Thickener Underflow
<br />Boreholes and Pipelines added
<br />Boreholes and Pipelines -
<br />(includes Figures EX49S-F4 and
<br />Design Drawings
<br />F5)
<br />Map 23C, Surface
<br />Revised maps showing I SW and
<br />Replaces Maps 23C (Sheets 1,2,
<br />Disturbance and Monitoring
<br />12 -Left Thickener Underflow
<br />& Base), 24 (Sheets 1 & 3), and
<br />(Sheets 1, 2, & Base)
<br />Boreholes and associated
<br />29 (sheets 1-4) in Volume V-A
<br />Map 24, Surface Facilities
<br />Pipelines
<br />and Freshwater Systems
<br />(Sheets I & 3)
<br />Map 29, Reclamation (Sheets
<br />1-4)
<br />
|