Laserfiche WebLink
EXHIBIT C-ACCOUNTING <br /> Recharge Pit Accounting black text=actual data <br /> Don Kehn Construction-Timnath Pit blue tent=projected data <br /> Case No.04CW6 <br /> (input) (input) (input) (to AWAS) (from AWAS) <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) <br /> VOLUME OF <br /> DELIVERY TO POND AREA: POND VOLUME: REDUCTION FOR PORTION OF <br /> DAY RECHARGE POND GAGE HEIGHT: BEGINNING OF BEGINNING OF ' POND VEGETATION VEGETATION RECHARGE <br /> GROWTH IN GROWTH IN NET INFILTRATION FROM ACCRETION AT <br /> POND BEGINNING OF DAY .DAY DAY EVAPORATIONS PRECIPITATION PRECIPITATION POND? POND. POND RIVER <br /> (AC-FT) (FT) (AC) (AC-FT) (AC-FT) (IN) (AC-FT) Yes/No (AC-FT) (AC-FT)0.00 <br /> 4/14/2015 0.00 0.00 0.0 - No 0.0- <br /> 4/15/2015 0.00 0.00 0.0 No > 0.0 0.00 <br /> 4/1 /2015 0.00 0.00 0.0 No 0.0 0.00 <br /> 4/17/201s 0.00 0.00 0.0 No 0.0 0.00 <br /> 4/18/2015 0.00 0.00 0.0 No' 0.0 <br /> 4/19/2015 0.00 0.00 <br /> 0.00 0.0 ,..;No 0.0 0.00 <br /> 4/20/2015 0.00 0.00 0.0 .tJo ':.' 0.0 0.00 <br /> 4/21/2015 0.00 0.00 0.0 No 0.0 <br /> 4/22/2015 0.00 0.00 <br /> 0.00 0.0 No. 0.0 0= <br /> 4/23/2015 0.00 0.00 0.0 No 0.0 <br /> 0.00 <br /> 4/24/2015 0.00 0.00 0.0 No 0.0 0.00 <br /> 4/25/2015 0.00 0.00 0.0 No-' 0.0 0.00 <br /> 4/26/2015 0.00 0.00 0.0 No 0.0 0.00 <br /> 4/27/2015 0.00 0.00 - 0.0 No - 0.0 0.00 <br /> 4/28/2015 0.00 0.00 0.0 1 0.0 0.00 <br /> 4/29/2015 0.00 0.00 0.0 No 0.0 0.00 <br /> 1 30/2015 0.00 0.00 0.0 No 0.0 1 0.00 <br /> 7 <br />