Laserfiche WebLink
-2- <br />I0. Primary Mine Entrance Location (report in either Latitude/Longitude OR UTM): <br />Latitude/Longitude: <br />Example: (N) 390 44' 12.98" <br />(W) 104- 59' 3.87" <br />Latitude (N): deg min sec (2 decimal places) <br />Longitude (W): deg min sec (2 decimal places) <br />OR <br />Example: (N) 39.73691° <br />(W) -104.98449- <br />Latitude (N) 38 84246 (5 decimal places) <br />Longitude(W) 106 53856 (5 decimal places) <br />OR <br />Universal Tranverse Mercator (UTM) <br />Example: 201336.3 E NAD27 Zone 13 <br />4398351.2 N <br />UTM Datum (specify NAD27, NAD83 or WGS 84) Nad 83 Zone 12 <br />Easting <br />Northing <br />11. Primary Future (Post -mining) Land Use (check only <br />one): <br />-0 Cropland(CR) <br />Pastureland(PL) <br />Ja General Agriculture(GA) <br />El Rangeland(RL) <br />0 Forestry(FR) <br />Wildlife Habitat(WL) <br />CI Residential(RS) <br />Recreation(RC) <br />lndustriaYCommercial(IC) <br />13 Developed Water Resources(WR) <br />© Solid Waste Disposal(WD) <br />12. Primary Present Land Use <br />(check only one): <br />❑ Cropland(CR) <br />R Pastureland(PL) <br />© General Agriculture(GA) <br />Rangeland(RL) <br />❑ Forestry(FR) <br />❑ Wildlife Habitat(WL) <br />0 Residential(RS) <br />Recreation(RC) <br />a Industrial/Commercial(IC) <br />0 Developed Water Resources(WR) <br />© Mining(MN) <br />13. Estimated Beeinnine Date of Contract: <br />June 2017 <br />13.1 Estimated completion date of contract: December 2018 <br />