Laserfiche WebLink
Table D-2 Worst Case Reclamation Costs <br />Activity Description <br />Time <br />Months <br />Cost S <br />Grading Stage 1 to final slopes. <br />0.25 <br />6667 <br />Grading sediment pond pad to final <br />slopes. <br />0.25 <br />3000 <br />Spreading 12 inches of topsoil over <br />Stage 1, sediment pond area, and <br />Usable Pad Area <br />0.25 <br />5711 <br />Backfilling portal <br />0.5 <br />593 <br />Seed to soiled areas <br />0.25 <br />708 <br />Disk to soiled areas <br />0.1 <br />354 <br />Mulch seeded areas <br />0.25 <br />1180 <br />Haul all facility sea cans offsite <br />0.25 <br />3000 <br />Totals <br />2.7 <br />21213 <br />DRMS Costs 28% x direct costs <br />5,940 <br />Total Bond Amount <br />27,153 <br />Detroit City Mine February 2017 D-4' <br />