Laserfiche WebLink
Mr. Peter Hays <br /> TR-28- Ute Park Extraction Wellfield <br /> June 8, 2017 <br /> radio transmitter. These will be powered and controlled by control panels located near the wellhead. <br /> Unlike the phase I and phase II wells, the pumps will have a variable frequency drive (VFD) allowing them <br /> to operate more efficiently, preventing cycling, and in turn extending the life of the pump. Draft well and <br /> piping drawings are included in Attachment 2. <br /> A check in the amount of $1,006.00 is included with this submittal to cover fees for this Technical <br /> Revision. If you have any comments, questions, or concerns regarding this project, please contact me at <br /> 720-942-3480 or Miguel Hamarat at 720-942-3255. <br /> Sincerely, <br /> Amber Parmet <br /> Senior Environmental Engineer <br /> Climax Molybdenum Company <br /> Henderson Operations <br /> Attachments: <br /> 1. Figures <br /> 2. Well Design and Pipeline Alignment <br /> 3. Pitless Unit Detail <br /> 4. Check#0000816857 in the amount of$1,006.00 <br /> cc(via email): <br /> T. Haynes, Climax <br /> M. Hamarat, Climax <br /> File <br />