My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-09_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2017-06-09_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2020 8:55:30 AM
Creation date
6/13/2017 8:02:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
6/9/2017
Doc Name
Adequacy Review Response #2
From
CC&V
To
DRMS
Type & Sequence
TR89
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine ■ <br /> Technical Specification No.02200-Earthworks ■ <br /> Concentrate Shipping <br /> Project No.475.0106.015 <br /> June 2,2017 <br /> content is reduced to an amount suitable for obtaining the specified degree of <br /> compaction, at no cost to CC&V. <br /> 9. After each layer of fill material has been placed, spread, and moisture-conditioned, <br /> the layer shall be compacted by passing compaction equipment over the entire <br /> surface of the layer a sufficient number of times to obtain the required density, as <br /> specified herein. Compaction shall be accomplished with equipment and by <br /> methods approved by CERTIFYING ENGINEER. If such equipment or methods are <br /> found unsatisfactory for the intended use, the CONTRACTOR shall replace the <br /> unsatisfactory equipment with other types or adjust methods until proper <br /> compaction is achieved. Prior to placement of a subsequent lift, the previous lift <br /> shall be thoroughly scarified to a nominal depth of 2-inches to provide good <br /> bonding between lifts. Scarification shall be accomplished by disking, raking with a <br /> grader, or an alternative method approved by the CERTIFYING ENGINEER. <br /> 10. The CQA Monitor will measure the ambient air temperature on an hourly basis. If <br /> the ambient air temperature is less than thirty-two degrees Fahrenheit for more <br /> than one hour over the preceding twenty-four (24) hours, the CQA Monitor will <br /> measure the temperature of the fill to determine if the fill is frozen. "Frozen" is <br /> defined as a mean temperature of thirty-two degrees Fahrenheit (32°F) or less. The <br /> CQA Monitor will measure the temperature at a depth of three (3) inches and six <br /> (6) inches, recording the lower of the two measurements. Six (6) measurements will <br /> be taken per acre, and if the average is below thirty-two degrees Fahrenheit (320F), <br /> the fill will be considered frozen. If the fill is determined to be frozen the <br /> CONTRACTOR may either remove and replace the frozen fill or wait until <br /> subsequent temperature monitoring indicates the fill is unfrozen at no cost to <br /> CC&V. <br /> B. Select Structural Fill <br /> 1. Select Structural Fill shall be placed for site grading as required by the OWNER and <br /> CERTIFYING ENGINEER. <br /> 2. CONTRACTOR shall condition Select Structural Fill to a moisture content that allows <br /> compaction to the required density and that results in a firm, unyielding surface <br /> capable of allowing the movement of vehicles and equipment over the surface <br /> without causing rutting or other deleterious effects. <br /> 3. CONTRACTOR shall place Select Structural Fill materials with less than 30 percent <br /> rock materials above 3/4-inch size in maximum 12-inch loose lifts, and compacted <br /> to 95 percent of maximum dry density and within 2% of the optimum moisture <br /> content as defined by ASTM D1557 (modified proctor). <br /> 4. CONTRACTOR shall condition and place Select Structural Fill containing more than <br /> 30 percent rock materials above 3/4-inch size (rock fill) in maximum 12-inch loose <br /> lifts and compact by a method compaction technique approved by the CERTIFYING <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.