Laserfiche WebLink
of ST OF l9 <br />_j� � <br />9 <br />RECEIVEdJ•S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />JUN 0 2 2017 <br />Division of Reclamatinn <br />Mine Site Evaluation <br />State Program <br />R" OF <br />n <br />S� <br />1. Permittee/Person """"'y "` vatt;ty <br />9. Permit Number 10. Permit Type <br />C81014 PP <br />11. Field Visit Date 12. Purpose 13. SRA Present <br />5/15/2017 lop 0 <br />14. Permit Status 15. Site Status 16. FacilityT pe <br />IN MC B <br />17. OSM Office # 18. CCID # 19. Land Code <br />1140 0 <br />20. M.S.H.A. ID # 21. State Abbrev. 22. CountyBurrough <br />CO 1FREMOYT <br />23. AVS Permittee Entity ID Number 24. State Office <br />1104631 <br />ENERGY FUELS COAL INC <br />2. Address <br />8081 SHAFFER PARKWAY STE 4 <br />TC Temporary Cessation: The RA has granted <br />3. City 4. State <br />LITTLETON CO <br />5. Zip Code 6. Phone Number <br />80127 1 1(303)925-0781 <br />7. Operator Name, if Different than Permittee <br />ENERGY FUELS COAL INC <br />8. Mine Name <br />SOUTHFIELD <br />begun. <br />25. Hours <br />2.0 a. Permit Review <br />2.0 b. Site Visit Time <br />5.0 c. Travel Time <br />1.0 d. Report Writing <br />AP Active Coal Producing: Coal surface mining <br />26. Signature Block <br />�� <br />27. Reviewing Official: <br />Signature: <br />Signature: <br />Review Date: p <br />mm - dd-yyyy <br />Is Supplemental MSE Page Used YM EY <br />Christine Belka, ID#182 <br />Printed Name: <br />Date: 5/26/2017 <br />Permit Type -Item 10 IP = Interim Program PP = Permanent Program NP = No Permit <br />Purpose Type Uodes - Item iz tA;K..cmzen uompiamc Kererrai (non-s¢e visit <br />Oxx...Oversight RFx..Reclamation Fees CC Citizen Complaint (initial site visit) <br />Axx...Assistance Fxx... Federal Actions CCF... Assistance <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector at any time during the review of the mine site <br />Permit Status - Item 14 AB Abandoned: All surface and underground coal mining activities have ceased and operator <br />A Active: Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as defined in 30 CFR 840:11(g). <br />disturbed. AB1 Bond Forfeiture: Bond forfeiture officially in process or completed and reclamation in <br />IN Inactive (Permanent Program Permit): Phase II completed or progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit): AB2 Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to reclaim site, <br />Coal mining completed and reclamation activities initiated. but site not reclaimed to Program standards. <br />BR Bond Release: Reclamation completed and State Regulatory A63 Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority(RA) has released all of the bond (Phase III Release). NA Not Applicable: When site is unpermitted. <br />Site Status - Item 15 <br />MC Mining Complete: No mining activity on site, site <br />ND No Disturbance: No coal mining and reclamation <br />regraded and awaiting bond release. <br />operations have been started. <br />TC Temporary Cessation: The RA has granted <br />EX Coal Exploration: Coal exploration operations have <br />cessation of mining pursuant to 30 CFR <br />started and where coal mining operations have not <br />816/817:13(b). <br />begun. <br />P1 Phase I Release: At least Phase I bond release <br />AP Active Coal Producing: Coal surface mining <br />granted for entire permitted area. For interim <br />activities are occurring. <br />permits, partial bond release. <br />AN Active Non -Producing: Active non -producing facility <br />P2 Phase II Release: At least Phase II bond release <br />such as tipple or preparation plant. <br />for the entire permitted area. <br />NM No Mining: The Permit Status is active, site is not in <br />P3 Phase III Release: Reclamation completed and <br />Temporary Cessation, no surface coal mining <br />the RA has released all bond. <br />activity, and site not regraded. <br />NS Non -Site Visit: Status of site not determined. <br />Forfeiture Pending: The RA is pursuing actions to <br />FP revoke the permit, collect the performance bond(s), <br />and/or reclamation of forfeited site is in progress. <br />FR Forfeited and Reclaimed: Forfeiture reclamation <br />completed. <br />FO Abandoned Site: Abandoned site that is permitted but <br />there is no bond. <br />WC Wildcat: Coal mining and reclamation operations have <br />or are taking place and the activity is not covered by <br />the required permits from the RA. <br />Facility Type Codes - Item 16 D .... Ancillary (Haulroad, Conveyor, and/or Rails H...Exploration Permits K .... Government Financed Construction Exemption <br />A .... Surface E .... Refuse and/or Impoundment I .... Notice of Intent to Explore L....Remining site permitted under 30 CFR 785.25 <br />B....Underground F....Loading Facility and/or Tipple J .... Exempt 16 and 2/3 <br />C....Preparation Plant G .... Stockpiles <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions. The Ombudsman will annually evaluate the enforcement activites and rate each agency's responsiveness to small business. If you are a small business (a business with 500 or <br />fewer employees inducing those of affiliates) and wish to comment on the enforcement or compliance activities of OSM, call 1 -888 -REG -FAIR (1-888-734-3247). <br />Page 1 <br />