Laserfiche WebLink
EkVibit E page 2 of 2 <br /> Access rd. � <br /> w <br /> •` Top of dam <br /> Na overburden will be stripped due the material is • 'N� '"' <br /> silty deposited into an existing pond and is only a <br /> • clean out of a pond. ' �;t; Y -r' ` 2:1 slope an the inside of dam face <br /> •• "'�6"of Top$oil on average to be spread out •''' ` to the bottom of the pond. <br /> over the area of the stockpile area and t� ••'�'�• `! "! <br /> topsoil area.Ground to be ripped or <br /> scarified to prep before seeding. No seed <br /> will be needed within the pond area.Any ;'.:•* ' .s 3:1 slopes from the <br /> other ground within the permit boundary edge of the pond also known as <br /> that was tOmpacted or vegetation +` r r' the shore line. <br /> destroyed will be scarified and seeded in W'i; <br /> the same manner as the stockpile area, ••f;� ,;..f ,� ` Shore line <br /> other than the inside of the pond.No <br /> shrubs or trees will be planted. • <br /> °9�► Otis Permit boundary <br /> �f` R <br /> Plan View of Lost Cause Reclamation Plan <br /> (Not to Scale) <br /> *This map is to used in conjunction«ith the <br /> Lost Cause Nrke Plan map shooing section lanes <br /> and legal descriptions. <br />