Laserfiche WebLink
As an intermittent status (IS) operator the following information is required with <br /> submittal of the annual report. A description of the condition of the operation at the <br /> time it entered IS; along with a description of the current condition of the operation, <br /> supplemented with maps. A description of the measures that have been, and will be <br /> implemented to comply with reclamation and performance standards and a description of <br /> the plans for resumption of mining. <br /> A. Description of the Condition when the Operation Entered IS <br /> 1. When Colowyo entered into IS status the operation was at a steady state. Material <br /> was being mined from the toe of the outcrop as needed or dozed down to the toe <br /> and mined accordingly. Operations and mining methods have not changed since <br /> the permit was issued. <br /> B. Description of Current Conditions of the Operation <br /> 1. The outcrop of rock being mined is a steady state and when material is needed it is <br /> mined from the toe of the slope, or some material is dozed down to the toe and <br /> mined accordingly. Please see Map 1 which delineates the mining area <br /> (disturbance boundary). <br /> C. Description of Reclamation and Performance Standards <br /> 1. Mining of the Neilson Pit is occurring as needed and reclamation of the Neilson <br /> Pit will not commence until mining is complete. Once mining is complete, <br /> Colowyo will reclaim the Nielson Pit in accordance with the Section 6.3.4 Exhibit <br /> D - Reclamation Plan of its permit to mine. <br /> VII. Site Contact Information <br /> Site contact information for the Neilson Pit was updated in 2016. Please see the revised <br /> 1 IOc Annual Report form for specific information. <br />