Laserfiche WebLink
Summary Table of Changes to Exhibits <br /> Exhibit Change <br /> Exhibit A—Legal Description No change <br /> Exhibit B—Index Map No change <br /> Exhibit C—Pre-Mining and Mining Plan Map Slurry wall added to the HIBE parcel (phase 4) <br /> Exhibit D—Mining Plan Annual production has been increased to <br /> 900,000 tons/year and phase 4 will be mined at <br /> a 3:1 slope. <br /> Exhibit E—Reclamation Plan Slurry wall design specifications are included <br /> with this application. <br /> Exhibit F—Reclamation Plan Map The HIBE parcel (phase 4)will be reclaimed <br /> into a water storage reservoir. <br /> Exhibit G—Water Information No change—Hall-Irwin will continue to operate <br /> under the approved Temporary Substitute <br /> Water Supply Plan. <br /> Exhibit H—Wildlife Information No change <br /> Exhibit I—Soils Information No change <br /> Exhibit J—Vegetation Information No change <br /> Exhibit K—Climate Information No change <br /> Exhibit L—Reclamation Costs We request that the Division calculate the <br /> reclamation costs. <br /> Exhibit M—Other Permits and Licenses No change <br /> Exhibit N—Source of Legal Right to Enter No change <br /> Exhibit 0—Owners of Record of Affected Land No change <br /> (Surface Area) and Owners of Substance to be <br /> Mined <br /> Exhibit P—Municipalities Within Two Miles No change <br /> Exhibit Q—Proof of Mailing of Notices to Attached <br /> County Commissioners and Soil Conservation <br /> District <br /> Exhibit R—Proof of Filing with County Clerk or Attached <br /> Recorder <br /> Exhibit S—Permanent Man-Made Structures We are providing a stability analysis to reflect <br /> the installation of a slurry wall around Phase 4 <br /> of the Mining Plan (the HIBE property). <br /> AMENDMENT TO BASELINE PERMIT#M-1997-058 <br />