Laserfiche WebLink
I _ 1 <br /> � 6 <br /> 2 ` EXISTING IMPROVED - <br /> DI S ! I FARM ACCESS ROA °� <br /> j <br /> i (NORTH TO WELD <br /> COUNTY ROAD 74 <br /> I APPROXI 4—o <br /> WWII <br /> 60'TEMPORARY PERMIT " <br /> CONSTRUCTION BOUNDARY I MINING LI _ _ _ 200 0 200 Feet <br /> A n326 37 I SINCLAIR PIPELIN Q) <br /> Rec No <br /> � j OMPANY (IN FEET) <br /> fJ 1 inch 300N. <br /> UT3 <br /> BOUND RY I \\ NOTES: <br /> APPROXIMATE I I HARMONY GARDE I. The proposed final land use for the Harmony Gardens Site is I Q MINING LIMITS �i SITE PERMIT AREA general agriculture. U <br /> 9.90 ACRES a 2. Reclaimed mine pit side slopes will be created from backfill <br /> Q r I : . wiCL <br /> th overburden. W tl <br /> 25'CITY OF GREELEY Q Q <br /> \ I I WATER LINE EASEMENT 3. All available topsoil and overburden material will be used for g <br /> O \ \I Rec. No.3245837 backfilling and site reclamation. _ Z <br /> rr Ii Q <br /> APPROXIMATE, , r 1 4. No slopes will be reclaimed any steeper than 3H:IV. W <br /> MINING LIMITS I ING W Z <br /> \\ %1 WATER LINES 5. The growth medium for revegetation will be replacement of W 0 <br /> z I 1 \ (CITY OF GREELEY) pre-existing topsoils. O X Q <br /> \ j j 6. The seed mixture for the proposed permit area provides a r w 2 <br /> O PERMIT \ I I 1 native grass seed mix. Q <br /> (� BOUNDARY I U <br /> 1 Revegetation Seed Mix Q W <br /> 1 <br /> Rate � <br /> Species (lbs PLS/acre) <br /> I I r Q Blue Grama 5 0 <br /> I I <br /> EXISTING GAS LINE <br /> (SINCLAIR PIPELINE j j QIRT Western Wheatgrass 3 F- <br /> COMPANY) <br /> Sideoats Grama 1 J <br /> 50'PIPELINE RIGHT-OF-WAY \ TOTAL 9 <br /> EASEMENT(BK 1641, PG 296) Rates are for drill seeding. If broadcast seeding is <br /> I g g <br /> I 1 u used,double seeding rates. <br /> I \ ' 7. Periodic inspection for noxious weeds,at least once a year W <br /> \ early in the season,will be done as part of a weed management W H 00 <br /> A �► plan. (n Q <br /> Cl) Ir <br /> 8. The portable processing facility and any other structures <br /> associated with mining will be removed from the site during Z) W O <br /> y final reclamation activities. 0 C) O <br /> W <br /> 20' MIN. U <br /> \ 9. Best Management Practices will be used to control erosion and W } <br /> RECLAIMED SLOPE <br /> stormwater suspended sediment runoff from the site during Cc I`__ <br /> I— <br /> .r► n \'. i C3 <br /> � � reclamation activities. _j z} � <br /> o HISTORIC GROUND _ — —v W Z <br /> TOP SOIL MINING HIGHWALL Z 0 U o <br /> z <br /> wo � ' LEGEND: Z 2 o <br /> n M ATE \ sr <br /> w <br /> ---- - ------------- LIMITS I O <br /> 3, -`------- — Permit Boundary `r =V <br /> ' 4' TOP SOIL <br /> ARP" ——————— Mining Setback Line <br /> 8 -10 r 2" TOP SOIL OUNDARY APPROXIMATE <br /> �I■ ® � � Permit Buffer Line ++ <br /> x MINING LIMITS <br /> \ ———————— Existing Easement LineOVA <br /> \ PERMIT e — Existing Gas Line <br /> OVERBURDEN BOUNDARY — w— Existing Water Line �,v,g�0� � P o g <br /> BACKFILL MATERIAL MINING FLOOR NOtA N <br /> Existing Dirt Access N N N <br /> Overburden Stockpiles w u_ a <br /> TYPICAL BACKFILL RECLAMATION m. = w <br /> N.T.S. p <br />