Laserfiche WebLink
lue eorth <br /> A - <br /> SOLUTIONS <br /> June 2, 2017 <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> Attn: Mr. Peter Hays <br /> 1313 Sherman Street; Room 215 <br /> Denver CO, 80203 <br /> RE: Response to Incompleteness Letter for Connell Resources, Inc. <br /> Harmony Gardens Site 110 Limited Impact Permit Application, M-2017-021 <br /> Dear Mr. Hays: <br /> The following discussion and attachments are submitted on behalf of our client, Connell Resources, <br /> Inc., in response to the Application Completeness Letter comments prepared by the Division of <br /> Reclamation, Mining and Safety dated May 31, 2017 for the Harmony Gardens Site 110 Limited <br /> Impact Construction Materials Reclamation Permit application. The information and discussion <br /> below addresses each comment as it was presented by the Division: <br /> 1. Additional documentation illustrating that John Warren has authority to sign on behalf of <br /> Connell Resources, Inc. is attached. <br /> 2. The overall property where the proposed mining site is located is currently being developed <br /> by the owner for landscape and nursery commercial and retail operations. The access road <br /> from Weld County Road 74 has recently been improved to support the landscape and <br /> nursery operations. Given the limited amount of material available within the proposed <br /> mining area and, therefore, the limited amount of overall truck traffic on the access road, the <br /> existing road should be acceptable for safe haul truck traffic. A more recent photograph of <br /> the site entry and access road is provided below. <br /> Blue Earth Solutions, LLC P.O. Box 2427 Fort Collins, CO 80522 (970)227-2803 <br />