My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-05_PERMIT FILE - M2017021
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017021
>
2017-06-05_PERMIT FILE - M2017021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2020 1:40:09 AM
Creation date
6/7/2017 9:51:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017021
IBM Index Class Name
Permit File
Doc Date
6/5/2017
Doc Name
Incompleteness Response
From
Connell Resources, Inc.
To
DRMS
Email Name
PSH
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will likely be disturbed on a frequent basis and seeding the stockpiles may not be practical during <br /> the course of the operation. If stockpile seeding is not used, surface roughening will be <br /> maintained to limit wind and water erosion. <br /> Stockpile Grass Seed Mixture <br /> Grass Species Rate <br /> (lbs PLS/acre) <br /> Intermediate Wheatgrass 5.0 <br /> Blue Grama 1.0 <br /> Triticale (sterile hybrid) 1.25 <br /> Rates are for broadcast seeding. <br /> In order to gain an understanding of the extent of the mining operation, it is helpful to know the <br /> acres disturbed by different aspects of the mining operation. Each aspect is listed in the <br /> following table with associated disturbed area. The table illustrates a point in time where the <br /> mining disturbance could be at its maximum. At the proposed Harmony Gardens Site, it is <br /> assumed that the mining disturbance will be at its greatest during mining of the east cell. During <br /> this scenario, no reclamation will have been performed in the west cell, leaving approximately <br /> 1,500 feet of side slope for backfilling. In the worst-case scenario, as mining begins in the east <br /> cell, reclamation will begin and progress in the west cell. <br /> Mine Operation Aspects and Disturbance Areas <br /> Mining Operation Disturbed <br /> Aspect Area (acres) <br /> Active Mining Area: <br /> A 1. Near vertical un-reclaimed pit side slopes (1,500 linear ft). 3.0 <br /> 2. Un-reclaimed pit floor. <br /> Miscellaneous Disturbed Areas: <br /> B 1. Internal haul roads. 0.5 <br /> 2. Other. <br /> Final Reclamation: <br /> C 1. Seeding. NA <br /> 2. Re-seeding <br /> Total Disturbed Area 3.5 <br /> Harmony Gardens Site <br /> DRMS Limited Impact I/0 Permit Application Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.