My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-05_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2017-06-05_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2020 1:38:41 AM
Creation date
6/7/2017 9:50:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Hydrology
Doc Date
6/5/2017
Doc Name
Water Monitoring - Groundwater
From
Arcadis Design & Consulting / Holcim β(US)β Inc.
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> DIVISION OF RECLAMATION,MINING AND SAFETY <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 <br /> Denver,Colorado 80203 D O L OI o N of <br /> Phone:(303)866-3567 RECLAMATION <br /> FAX:(303)832-8106 MINING <br /> βsStβ <br /> SAFETY <br /> February 24,2009 <br /> Bill Ritter,Jr. <br /> Governor <br /> Mr.Joel Bolduc <br /> Hams D.Sherman <br /> Holcim, (US)Inc Executive Director <br /> 3500 Highway 120 Ronald W.Cattany <br /> Florence,CO 81226 Division Director <br /> Natural Resource Trustee <br /> Re: Proposed Groundwater Monitoring Plan,DRMS Permit#M-1977-344 Portland Cement Plant. <br /> Dear Mr.Joel <br /> To fulfill the requirements of Technical Revision#6,for permit#M-1977-344,Portland Cement quarry and <br /> plant,ground water monitoring plan, the Division sets the following monitoring and compliance wells . <br /> The site is located in Fremont County,North side of the Arkansas River. Groundwater flows in the area in a <br /> southerly direction towards the river. <br /> Holcim will sample MW-7 WELL Compliance well, annually for the following parameters. <br /> Total Dissolved Solids (TDS)3,918 MG/L <br /> Sulfate (SO4) 2,080 MG/L <br /> Potassium(K) 17 MG/L <br /> Sodium (Na) 226 MG/L <br /> Iron (Fe) 4.5 MG/L <br /> Manganese (Mn) 0.88 MG/L <br /> In addition Holcium will drill in April 2009. compliance well MW-13 near the entrance to the quarry and <br /> will provide five quarters of data, so the Division will determine the appropriate parameters for the well. and <br /> set compliance parameters. In addition to MW-7, Holcim will also monitor MW-12, as a background well <br /> and provide the same parameters as MW-7 on an annual basis. When two consecutive parameters are <br /> exceeded more than 10%, during the reporting year for compliance well MV-7, Holcim will increase the <br /> frequency of monitoring to bi-yearly. If the upward trend continues. Holcim will submit an explanation and <br /> provide a remedial plan. <br /> If you have questions, please contact me at 302 866-3567 xt 8129. <br /> Sincerely, <br /> erhan Keffelew <br /> Office of Office of <br /> Mined Land Reclamation Denver - Grand Junction - Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.