Laserfiche WebLink
TABLE 3 - Hillside Adits <br /> Trucked <br /> Placement <br /> Item Volumet (cu. ft.) Description <br /> Minnesota Adit <br /> 1 Pipe, PVC, Misc. 963 PVC-Plastic <br /> 2 Steel, Misc. 1,650 Concrete <br /> 3 Portal Gate 75 Steel <br /> 4 Portal Steel 150 Steel <br /> 5 Portal Walls, Steel 23 Steel <br /> CV Adit <br /> 1 Vent Riser 47 Steel <br /> 2 Portal Steel 203 Steel <br /> 3 Telephone Poles 16 Steel <br /> 4 Power Cable 2 Steel <br /> Sunshine Adit <br /> 1 Power Cable 7 Copper+ Ins <br /> 2 Steel, Misc. 38 Steel <br /> 3 Portal Walls, Sheet Steel 25 Steel <br /> Pierce Adit <br /> 1 Portal Steel 27 Steel <br /> 2 Culvert 34 Steel <br /> 3 Monitor Well 2 Steel <br /> 4 Monitor Well Foundation 2 Concrete <br /> Black Forest Adit <br /> 1 Gate 183 Steel <br /> 2 Steel, Misc., Lift 28 Steel <br /> 3 Fence 30 Steel <br /> 4 East Portal Entrance - Culvert 51 Steel <br /> 5 Monitor Well 2 Steel <br /> 6 Monitor Well Foundation 2 Concrete <br /> Total 3,560 <br />