My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-06_REPORT - M2002118
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2002118
>
2017-06-06_REPORT - M2002118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 8:59:51 AM
Creation date
6/7/2017 8:51:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002118
IBM Index Class Name
Report
Doc Date
6/6/2017
Doc Name
Annual Fee/Report/Map
From
APC Southern Construction Co., LLC
To
DRMS
Annual Report Year
2016
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />backfilled: <br />Total acres <br />seeded w/ <br />approved mix: <br />Total acres <br />iv/topsoilmulched <br />replaced: <br />Total acres <br />w/ <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons/ac): <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />L4 <br />FertifizerI <br />F15c- tAc <br />t�, <br />Mulch <br />application <br />application <br />application <br />method:method: <br />, 5 <br />method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO ( N/A) <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the repoaap. <br />14. Is adequate topsoil reserved for reclamation, based an your approved permit? (YES ) NO N/A <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? CYt—S) NCI N/A <br />If "NO" please explain: <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of theState <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO <br />17. Are all hazardous materials stored within approved spill containment structures? YES NO QNLA <br />1--,- <br />18. is your financial warranty value sufficient to cover the cost to complete reclamation? (YES NO N/A <br />S <br />19. is your basis for legal right to enter still valid? YES NO <br />20. Does your permit require you to submit monitoring information annually? YES NO(�NND/A <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />2I . As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.