Laserfiche WebLink
PART I ' <br />Page 4 of 19 • <br />Permit No.: CO -048233 <br />B. TERMS AND CONDITIONS <br />1. Facilities Operation and Maintenance <br />The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related <br />appurtenances) which are installed or used by the permittee as necessary to achieve compliance with the conditions of this <br />permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance <br />procedures. This provision requires the operation of backup or auxiliary facilities or similar systems when installed by the <br />permittee only when necessary to achieve compliance with the conditions of the permit. However, the permittee shall operate, <br />at a minimum, one complete set of each main line unit treatment process whether or not this process is needed to achieve <br />permit effluent compliance. Any slute produced at the wastewater treatment facility shall be disposed of in,accordance with <br />State and Federal guidelines and regulations. <br />2. Compliance Schedule <br />All information and written reports required by the following compliance schedules should be direced to the Industrial Unit <br />of the Permits Section for final review unless otherwise stated. <br />• <br />a. Mixing Zone Analyses— Conduct remaining threshold tests for exclusion from further analysis under Mixing Zone <br />Regulations. The second threshold test is the Application of the Mixing Zone Exclusion Tables (p. 20,Colorado Mixing <br />Zone Implementation Guidance February 2002). Under this compliance action, the permittee will collect the necessary site- <br />specific data, perform the required analysis, and provide a report to the Division. The report will indicate the findings ofthis . <br />threshold test and, if not excluded, provide theworkplan for the next threshold test (i.e., determining of the size of the <br />physical and regulatory mixing zones). <br />Effluent Limitations <br />Maximum <br />Concentrations <br />Monitorine Requirements <br />E luentParameter <br />30 -Day <br />Average * <br />7-Day]Daily <br />Average *Maximum <br />2 -Year <br />Awrage <br />Frequencv * <br />Sample Tym <br />Effluent Flow (MGD) <br />0.058 <br />Report <br />a <br />Continuous <br />Recorder <br />mP_ <br />Tel <br />DaiY Max (� Until <br />04/30/2010 <br />'Report <br />- ........ . _:.. <br />. <br />._ ....... _........ _ ..... <br />Continuous <br />Recorder <br />TempMWAT CC)Beginning <br />05/01/2010 <br />Continuous <br />Recorder <br />pH (su) <br />2 Days/Month <br />Grab <br />TSS (mg/1) <br />30 <br />45 <br />Quarterly <br />Gab <br />Oil and Grease (nigh) <br />10 <br />Quarterly <br />Visual <br />TDS (mg/1) <br />Report <br />Quarterly <br />Grab <br />As, T (ug/1) <br />Report <br />.Report <br />2 Days/Month <br />Grab <br />As, PD (µg/1) <br />Report <br />Report <br />2 Days/Month <br />Grab <br />Cri-3, TRg/1 <br />_....).. ,...._,.._..._-__._.._...... <br />Report ;Report <br />2Days/Month <br />Grab <br />Cu, PD (µg/1) <br />Report <br />Report `Report <br />2 Days/Month <br />Grab <br />Fe, Dis (µg/1) <br />Report <br />Report <br />2 Days/Month = <br />Gab <br />Fe, TR (µg/1) <br />Report <br />Report <br />Quarterly <br />Gab <br />Mn, -PD 1. <br />(µg/) .. <br />Report <br />Report :Report <br />2 Days/Month <br />Giab _ <br />Hg Tot (µg/1) _. <br />Report <br />Report <br />2 Days/Month <br />;Grab <br />Ag; PD (µg/1) ` <br />Report <br />Report Report <br />2 Days/Month-. ' : <br />Grab . <br />Zri,-PD (µg/1)" ' <br />_._ .... ... .. .... <br />Report <br />- :Report :Report <br />2 Days/Month ` '' ' <br />Gab, <br />_. <br />B, Tot 1 <br />..... <br />Report <br />Report <br />2 Days/Month <br />Gab <br />Sulfide (mg/l) <br />Report <br />Report <br />2 Days/Month <br />Grab <br />B. TERMS AND CONDITIONS <br />1. Facilities Operation and Maintenance <br />The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related <br />appurtenances) which are installed or used by the permittee as necessary to achieve compliance with the conditions of this <br />permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance <br />procedures. This provision requires the operation of backup or auxiliary facilities or similar systems when installed by the <br />permittee only when necessary to achieve compliance with the conditions of the permit. However, the permittee shall operate, <br />at a minimum, one complete set of each main line unit treatment process whether or not this process is needed to achieve <br />permit effluent compliance. Any slute produced at the wastewater treatment facility shall be disposed of in,accordance with <br />State and Federal guidelines and regulations. <br />2. Compliance Schedule <br />All information and written reports required by the following compliance schedules should be direced to the Industrial Unit <br />of the Permits Section for final review unless otherwise stated. <br />• <br />a. Mixing Zone Analyses— Conduct remaining threshold tests for exclusion from further analysis under Mixing Zone <br />Regulations. The second threshold test is the Application of the Mixing Zone Exclusion Tables (p. 20,Colorado Mixing <br />Zone Implementation Guidance February 2002). Under this compliance action, the permittee will collect the necessary site- <br />specific data, perform the required analysis, and provide a report to the Division. The report will indicate the findings ofthis . <br />threshold test and, if not excluded, provide theworkplan for the next threshold test (i.e., determining of the size of the <br />physical and regulatory mixing zones). <br />