Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.5047 <br />0.830 <br />1.000 <br />0.903 <br />0.930 <br />0.894 <br />1.000 <br />Adjusted unit <br />787.33 LCY/hr <br />production: <br />Adjusted fleet <br />3149.32 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: <br />4 Dozer(s) <br />Unit cost: <br />$0.667/LCY <br />Total job time: <br />2.36 Hours <br />Total job cost: <br />$4,947 <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB <br />(CAT HB <br />(CAT HB <br />(PAT) <br />