Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.5590 <br />0.830 <br />1.000 <br />1.000 <br />0.930 <br />0.894 <br />1.000 <br />Adjusted unit 1,138.57 LCY/hr <br />production: <br />Adjusted fleet 4554.28 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.461/LCY <br />Total job time: 17.50 Hours <br />Total job cost: $36,728 <br />1 SHIFT/DA <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />