My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-02_PERMIT FILE - M2016085
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016085
>
2017-06-02_PERMIT FILE - M2016085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 7:31:22 AM
Creation date
6/5/2017 7:28:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016085
IBM Index Class Name
Permit File
Doc Date
6/2/2017
Doc Name
Addendum To Application
From
Northern Colorado Constructors
To
DRMS
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number: <br />AIRS ID Number: I / <br />Section 4 - Processing/Manufacturing Information Ft Material Use <br />❑ Check this box if ADEN is for haul Roads only (not located at a mining site) and complete the applicable sections, <br />Section 4H - Raw Material Transport and/or Section 41- Finished Product Trans ort on pages 6 and 7. Otherwise <br />complete all of Section 4. <br />Actual Annual Production (tons) <br />Requested.Annual Productfon4 (tans) 750, 000 - 1, 0001 000 tons <br />-Kequesteu values wtti oecorne permit llmftatIons. Requested limit(s) should consider future process growth. <br />Removal <br />Topsoil removed daily (tons) 1200 <br />Topsoil removed annual (tats) 50,000 <br />Proposed controls for topsoil removal <br />[J Moist Material <br />ED Water Spray <br />0 Other (specify) <br />Section 4A - Topsoil <br />Stockpile(s) <br />Maximum stared on site (tens) 550,000 <br />Proposed controls for topsoil stockpile <br />E) Watering <br />0 Chemical stabilizer <br />0 Compacting of Piles <br />0 Enclosures (chanse am option from maw) <br />0 Complete ❑ Partial <br />❑+ Revegetat{Ori (must occur within one year of site disturbance) <br />❑ Other (specify) <br />Section 46 - Overburden <br />Removal <br />Equipment used for removal Scraper Haul Truck, Excavator <br />Tons removed by dragline (dwiy) <br />Tons removed by dragtfne ronnuai) <br />DragFne drop height (feet) <br />Hours scraper operated (darty) E3 <br />Hours scraper operated (annual) 240 <br />Proposed controls .`or overburden removal <br />Moist material <br />j] Water Spray <br />I] Other (specify) <br />5tockpflets) <br />Maximum stared on site irons) 100,000 <br />Proposed contro.s for overburden stockpile <br />Ia Watering <br />❑ Chemical stabilizer <br />I] Compacting of piles <br />❑ Enclosures (choose one option from below) <br />❑ Camp(ete ❑ Partial <br />EI Revegetation (must occur within one year of site disturbance) <br />,J Other (specify) <br />'3a.>> <br />
The URL can be used to link to this page
Your browser does not support the video tag.