My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-01_REPORT - M2015028
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2015028
>
2017-06-01_REPORT - M2015028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2017 11:03:03 AM
Creation date
6/2/2017 9:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015028
IBM Index Class Name
Report
Doc Date
6/1/2017
Doc Name
Annual Fee/Report/Map
From
Teton Drilling Inc.
To
DRMS
Annual Report Year
2017
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 5 <br />110(1) Annual Report <br />RECEIVED <br />JUN U 1 2117 <br />DMSION OF RECLAMATION, <br />MINI EE 8 .p d---� <br />(DRMS Office Use Only) <br />Permit Number: <br />M-2015-028 <br />Permittee Name: <br />Teton Drilling Inc. <br />Operation Name: <br />Dixie Mine <br />County: <br />Clear Creek <br />Anniversary Date: <br />June 2, 2017 <br />Current Bond Amt: <br />$5,000.00 <br />Annual Fee Due: <br />$172.00 <br />Permit Acreage: <br />4 <br />DRMS Specialist <br />AC <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required monitoring <br />information, reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to <br />occur during the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the <br />beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1)? OYESNO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? /® <br />5. Does the mine operate more than 180 days per year YES NO <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES NO <br />b) approval for INTERMITTENT OPERATION? YES NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation): 0 <br />8. Number of acres that were newly affected during the current report year: 4 <br />9. Number of acres that were reclaimed during the current report year: 0 <br />10. Estimated new acreage to be affected in the next report year: <br />11. Estimated acres to be reclaimed in the next report year: 0 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />
The URL can be used to link to this page
Your browser does not support the video tag.