Laserfiche WebLink
Table 2.05.4(2)(a)-1 <br />Reclamation Time Table <br />Activity <br />Year <br />Contemporaneous Reclamation of Mined Area <br />2013-2020 <br />Backfill Replacement <br />2013-2022 <br />Topsoil Replacement <br />2013-2022 <br />Relocation of CC Ditch <br />2018 <br />Facilities <br />2022 <br />Haul Roads <br />2022 <br />'The light use road connecting the mining area to Pond 001 will not be reclaimed as it was present pre -mining. <br />Section 2.05.4 Page 2 February 2017 (TR -15) <br />