Laserfiche WebLink
SEDCAD 4 for Windows <br />(`n mmm 1QQf2 -,?nln Pam i. i Crhwoh <br />Dewatering time is calculated from peak stage to lowest sail/way <br />Elevation-Cagacity-Discharge Table <br />Elevation <br />Area <br />(ac) <br />Capacity <br />(ac -ft) <br />Discharge <br />(cfs) <br />Dewater <br />Time <br />(hrs) <br />5,675.25 <br />1.540 <br />0.000 <br />0.000 <br />Top of Sed. Storage <br />5,675.25 <br />1.540 <br />0.006 <br />0.000 <br />5,675.50 <br />1.571 <br />0.395 <br />0.000 <br />5,675.75 <br />1.602 <br />0.791 <br />0.000 <br />5,676.00 <br />1.633 <br />1.196 <br />0.000 <br />5,676.25 <br />1.663 <br />1.608 <br />0.000 <br />5,676.50 <br />1.693 <br />2.027 <br />0.000 <br />5,676.75 <br />1.724 <br />2.455 <br />0.000 <br />5,677.00 <br />1.755 <br />2.889 <br />0.000 <br />5,677.25 <br />1.785 <br />3.332 <br />0.000 <br />5,677.50 <br />1.815 <br />3.782 <br />0.000 <br />5,677.75 <br />1.845 <br />4.239 <br />0.000 <br />5,678.00 <br />1.875 <br />4.704 <br />0.000 <br />5,678.25 <br />1.898 <br />5.176 <br />0.000 <br />5,678.50 <br />1.920 <br />5.653 <br />0.000 <br />5,678.75 <br />1.943 <br />6.136 <br />0.000 <br />5,679.00 <br />1.966 <br />6.624 <br />0.000 <br />5,679.25 <br />2.003 <br />7.121 <br />0.000 <br />5,679.50 <br />2.040 <br />7.626 <br />0.000 <br />5,679.75 <br />2.078 <br />8.141 <br />0.000 <br />5,680.00 <br />2.116 <br />8.665 <br />0.000 <br />5,680.25 <br />2.146 <br />9.198 <br />0.000 <br />5,680.50 <br />2.176 <br />9.738 <br />0.000 <br />5,680.75 <br />2.206 <br />10.286 <br />0.000 <br />5,681.00 <br />2.237 <br />10.841 <br />0.000 <br />5,681.25 <br />2.268 <br />11.404 <br />0.000 <br />5,681.50 <br />2.299 <br />11.975 <br />0.000 <br />5,681.75 <br />2.330 <br />12.554 <br />0.000 <br />5,681.90 <br />2.349 <br />12.904 <br />0.000 <br />Spillway #2 <br />5,682.00 <br />2.361 <br />13.140 <br />0.463 <br />6.16* <br />5,682.25 <br />2.394 <br />13.734 <br />3.026 <br />7.40 <br />5,682.50 <br />2.428 <br />14.337 <br />6.591 <br />3.00 <br />5,682.75 <br />2.462 <br />14.948 <br />7.845 <br />1.75 <br />5,683.00 <br />2.496 <br />15.568 <br />8.924 <br />1.70 Spillway #1 <br />5,683.25 <br />2.533 <br />16.197 <br />13.256 <br />1.55 <br />5,683.29 <br />2.540 <br />16.312 <br />14.023 <br />0.45 Peak Stage <br />5,683.50 <br />2.570 <br />16.835 <br />17.502 <br />5,683.75 <br />2.608 <br />17.482 <br />21.681 <br />Filename: Pond NHN-002 AS -BUILT 25YR EVENT_02.13.17.sc4 <br />Appendix 2.05.3(4)-10 <br />Page 21 <br />Printed 02-13-2017 <br />February 2017 (TR -15) <br />