Laserfiche WebLink
SEDCAD 4 for Windows <br />Cnmvinht 1Q�R AMfI Pnmcla I Gh--h <br />Structure Detail; <br />Structure #1 (Culvert) <br />Pit Pumping <br />Culvert Inputs: <br />Max. Entrance <br />Length (ft) Slope (%) Manning's n Headwater Tailwater (ft) Loss Coef. <br />(ft) (Ke) <br />1,000.00 2.00 0.0140 1.00 0.00 0.90 <br />Culvert Results: <br />Structure #2 [Pond) <br />Pond NHN-002 <br />Pond Inputs: <br />Design Discharge = 2.00 cfs <br />Minimum pipe diameter: 1 - 12 inch pipe(s) required <br />Initial Pool Elev: <br />5,678.25 ft <br />Initial Pool: <br />5.09 ac -ft <br />*Sediment Storage: <br />1.84 ac -ft <br />Dead Space: <br />20.00% <br />*Sediment capacity based on A veraye Annual R of 20.0 for 3 year(s) <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />5,683.00 30.00 3.60:1 3.20:1 8.10 <br />Enhanced Perf. Riser <br />Riser Riser Height <br />Diameter (in) <br />Barrel Barrel Length Barrel SlopeSpillway <br />Diameter (in) <br />Elev Number of <br />Mannings n Holes per <br />(ft) <br />(ft) (%) <br />(ft) <br />Elev <br />18.00 3.90 <br />18.00 40.00 1.00 <br />0.0150 5,681.90 2 <br />Pond Results: <br />Peak Elevation: <br />5,680.02 ft <br />H'graph Detention Time: <br />12.05 hrs <br />Pond Model: <br />CSTRS <br />Dewater Time: <br />2.92 days <br />Trap Efficiency: <br />85.20 <br />A <br />Filename: Pond NHN-002 AS -BUILT 10YR EVENT_02.13.17.Sc4 Printed 02-13-2017 <br />Appendix 2.05.3(4)-10 Page 10 February 2017 JR -15) <br />