My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-12_PERMIT FILE - C2010089A (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2017-05-12_PERMIT FILE - C2010089A (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 9:46:48 AM
Creation date
6/1/2017 7:07:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
Permit File
Doc Date
5/12/2017
Doc Name
Pond NHN-002 & NHN-002 DItch Designs
Section_Exhibit Name
Appendix 2.05.3(4)-8
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NHN-002 Ditch Designs <br />Two ditches will convey stormwater runoff to Pond NHN-002: NHN-002 North and NHN-002 <br />South. Each of these ditches has been designed to convey the 10 -YR, 24 -HR event flow to the <br />sediment pond. Table 2.05.3(4)-8-1 shows the peak flows for the subwatersheds that feed each <br />ditch. Subwatershed SW2-A feeds NHN-002 South, while SW2C feeds NHN-002 North, leaving <br />the remainder of SW2 (SW2-B) draining directly into Pond NHN-002. Map 2.05.3(4)-9 shows the <br />anticipated route for each ditch as well as the subwatersheds. Both ditches are designed to use <br />a trapezoidal cross section with sideslopes no steeper than 2H:1V. This design will facilitate <br />ease of construction given the size and length of the ditches. <br />Map 2.05.3(4)-9 shows the route of both NHN-002 North and NHN-002 South ditches, profiles <br />with the anticipated grades of the ditches, and design details and criteria for each. It is <br />anticipated that only one portion of the NHN-002 South will be steep enough to require riprap or <br />plastic lining. The remaining segments of NHN-002 South and all of NHN-002 North will have <br />excavated overburden as their lining. <br />SEDCAD Model 1 shows the ditch designs based on the appropriate subwatersheds and <br />channel lining. Also included at the end of Model 1 is a demonstration of the NHN-002 South <br />ditch with plastic for lining as opposed to riprap on the steep portion. <br />APPENDIX 2.05.3(4)-8 PAGE - 8 - September 2014 (TR 06) <br />
The URL can be used to link to this page
Your browser does not support the video tag.