My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-12_PERMIT FILE - C2010089A (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2017-05-12_PERMIT FILE - C2010089A (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 9:46:48 AM
Creation date
6/1/2017 7:07:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
Permit File
Doc Date
5/12/2017
Doc Name
Pond NHN-002 & NHN-002 DItch Designs
Section_Exhibit Name
Appendix 2.05.3(4)-8
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDCAD 4 for Windows <br />(`—,Hri h} 1 OOR _901 l) P-1. I crh,u�h <br />Structure Detail: <br />Structure #1 (Culvert) <br />Pit Pumping <br />Culvert Inputs: <br />Max. Tailwater Entrance <br />Length (ft) Slope (%) Manning's n Headwater ft Loss Coef. <br />(ft) () (Ke) <br />1,000.00 2.00 0.0140 1.00 0.00 0.90 <br />Culvert Results: <br />Design Discharge = 2.08 cfs <br />Minimum pipe diameter: 1 - 12 inch pipe(s) required <br />Structure #2 (Pond, <br />Pond NHN-002 <br />Pond Inputs: <br />Perforated Riser <br />Riser <br />Riser Height <br />Diameter <br />Initial Pool Elev: <br />5,684.00 ft <br />(ft) <br />(in) <br />Length (ft) (oho) <br />(in) <br />Initial Pool: <br />12.35 ac -ft <br />18.00 10.00 1.00 <br />Emergency Spillway <br />Spillway Elev Crest Length Left <br />Right Bottom <br />(ft) Sideslope <br />Sideslope Width (ft) <br />5,686.00 10.00 2.00:1 <br />2.00:1 10.00 <br />Perforated Riser <br />Riser <br />Riser Height <br />Diameter <br />Barrel <br />Barrel Barrel Slope <br />Diameter <br />Number of <br />Spillway Elev <br />Manning's n Holes per <br />(ft) <br />(in) <br />Length (ft) (oho) <br />(in) <br />(ft) <br />Elev <br />18.00 6.00 <br />18.00 10.00 1.00 <br />0.0140 5,684.00 2 <br />Pond Results: <br />Peak Elevation: 5,686.35 ft <br />Dewater Time: 1.49 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation -Capacity -Discharge Table <br />5 <br />Filename: Pond NHN-200 25YR EVENT PRINCIPAL SPILLWAY OPEN 030CT14.sc4 Printed 10-03-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.