My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-19_REPORT - M1992016
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1992016
>
2017-05-19_REPORT - M1992016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 4:10:48 AM
Creation date
5/31/2017 9:32:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992016
IBM Index Class Name
REPORT
Doc Date
5/19/2017
Doc Name
Annual Fee/Report/Map
From
Rocky Mountain Materials and Asphalt
To
DRMS
Annual Report Year
2016
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total 108 Total acres 108 Total 128 Total acres <br /> acres seeded w/ acres mulched w/ <br /> Total 108 Total acres Ta Topsoil 6 Mulch 0 <br /> acres fertilized w/ replacemen application rate <br /> Seed Drill Fertilizer Broadcast Mulch N/A <br /> applicatio applicatio applicatio <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N/A <br /> If"YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit? FYES NO N/A <br /> If"NO", please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(l)? YES I NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater,is the site in compliance with the approved mining plan and Office of the State <br /> Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br /> 18. Is}-our financial warranty value sufficient to cover the cost to complete reclamation? YES NO N/A <br /> 19. Is your basis for legal right to enter still valid? YES NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO N/A <br /> If"Yes", please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials (C.R.S. 34-32-116 or 34-32.5-1 16),attach a map to this report that accurately depicts the permit <br /> boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: X <br />
The URL can be used to link to this page
Your browser does not support the video tag.