Laserfiche WebLink
SEDCAD 4 for Windows <br />r: inh} 100R _gn1n P._.i. i Crhui�h <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation -Capacity -Discharge Table <br />Elevation <br />Area <br />(ac) <br />Capacity <br />(ac -ft) <br />Discharge <br />(cfs) <br />Dewater <br />Time <br />(hrs) <br />5,667.49 <br />0.896 <br />0.000 <br />0.000 <br />Top of Sed. Storage <br />5,667.50 <br />0.898 <br />0.011 <br />0.000 <br />5,667.75 <br />0.927 <br />0.239 <br />0.000 <br />5,668.00 <br />0.956 <br />0.474 <br />0.000 <br />5,668.25 <br />0.981 <br />0.716 <br />0.000 <br />5,668.50 <br />1.007 <br />0.964 <br />0.000 <br />5,668.75 <br />1.033 <br />1.219 <br />0.000 <br />5,669.00 <br />1.059 <br />1.481 <br />0.000 <br />5,669.25 <br />1.085 <br />1.749 <br />0.000 <br />5,669.50 <br />1.110 <br />2.023 <br />0.000 <br />5,669.75 <br />1.137 <br />2.304 <br />0.000 <br />5,670.00 <br />1.163 <br />2.591 <br />0.000 <br />5,670.25 <br />1.189 <br />2.885 <br />0.000 <br />5,670.50 <br />1.215 <br />3.186 <br />0.000 <br />5,670.75 <br />1.241 <br />3.493 <br />0.000 <br />5,671.00 <br />1.268 <br />3.807 <br />0.000 <br />5,671.25 <br />1.293 <br />4.127 <br />0.000 <br />5,671.50 <br />1.319 <br />4.453 <br />0.000 <br />Low hole SPW #2 <br />5,671.75 <br />1.344 <br />4.786 <br />0.142 <br />28.31* <br />5,672.00 <br />1.370 <br />5.125 <br />0.961 <br />4.27* <br />5,672.25 <br />1.420 <br />5.474 <br />1.359 <br />3.65 <br />5,672.50 <br />1.471 <br />5.835 <br />1.665 <br />2.90 <br />5,672.75 <br />1.522 <br />6.209 <br />1.922 <br />2.55 <br />5,673.00 <br />1.575 <br />6.597 <br />2.149 <br />2.30 <br />5,673.25 <br />1.664 <br />7.001 <br />2.354 <br />2.20 <br />5,673.50 <br />1.755 <br />7.429 <br />2.543 <br />2.10 <br />5,673.75 <br />1.849 <br />7.879 <br />2.719 <br />2.05 <br />5,674.00 <br />1.945 <br />8.353 <br />2.884 <br />2.25 <br />5,674.25 <br />1.981 <br />8.844 <br />3.040 <br />5.60 <br />5,674.27 <br />1.984 <br />8.875 <br />3.049 <br />1.15 <br />Peak Stage <br />5,674.50 <br />2.018 <br />9.344 <br />3.188 <br />5,674.75 <br />2.055 <br />9.853 <br />3.330 <br />5,675.00 <br />2.093 <br />10.372 <br />3.466 <br />5,675.25 <br />2.131 <br />10.900 <br />3.596 <br />5,675.50 <br />2.169 <br />11.437 <br />3.723 <br />Spillway #2 <br />5,675.75 <br />2.207 <br />11.984 <br />3.845 <br />5,676.00 <br />2.246 <br />12.541 <br />5.165 <br />5,676.25 <br />2.286 <br />13.107 <br />7.369 <br />Filename: Pond NHN-001 AS -BUILT 10YR EVENT_02.13.17.sc4 Printed 02-15-2017 <br />