Laserfiche WebLink
4. Linear detention and filtering structures that include filter fence, straw bale barrier, brush <br />barrier, and filter berms; <br />5. Measures used in conjunction with overland conveyances including check dams, <br />sediment traps, straw wattles, and water level spreaders; <br />All surface mining operations will be conducted to achieve the effluent limitations of 4.05.2(7) <br />for all mixed drainage when it leaves the permit area. Sedimentation ponds or impoundments <br />will be constructed before creating new disturbances, unless approved drainage diversions or <br />other surface water control structures are installed. <br />Appendix 2.05.3(4)-1 contains the design of the sediment control facilities for NHN. Subsequent <br />designs and as -built certifications for ponds NHN-001 and NHN-002 and their collection ditches <br />supersede the designs included in the Appendix 2.05.3 (4)-1 for the same structures. The as -built <br />certification for Pond NHN-001 is located in Appendix 2.05.3(4)-6 and the as -built certification <br />of the Pond NHN-001 collection ditches is located in Appendix 2.05.3(4)-7. Also, a new design <br />for Pond NHN-002 and its collection ditches is located in Appendix 2.05.3(4)-8. Finally, the as - <br />built certification for Pond NHN-002 is located in in Appendix 2.05.3(4)-10. <br />Collection Ditch and Culvert Design Parameters <br />The main collection ditches in the permit area are the NHN-001 East and West, The NHN-002 <br />North and South, and the NHN-003 North and South Ditches. These ditches are used to transport <br />runoff into Sedimentation Ponds NHN-001, NHN-002 and NHN-003 for treatment in accordance <br />with the requirements of applicable regulations. The location and drainage area of these ditches <br />can be found on Map 2.05.3(4)-1. Culvert designs are presented in Appendix 2.05.3(3)-1 and <br />were designed using SEDCAD software. Subwatershed areas were created for each of the areas <br />flowing to the individual culverts. For disturbed areas, a curve number of 86 was used in <br />SEDCAD for bare soils in hydrologic soil group B. Culvert C-7 was designed using a curve <br />number of 81 since the watersheds consist of a herbaceous mixture of grass, weeds, and low - <br />growing brush (Arid and Semiarid Rangelands) with fair hydrologic conditions (30%-70% <br />ground cover) in hydrologic soil group C and are not a part of the mine disturbance area. All <br />ditches were designed in accordance with applicable regulations in 4.05.3. <br />Designs for all Ditches in the Permit Area <br />Steps taken in the ditch designs are outlined in Appendix 2.05.3(4)-1, Appendix 2.05.3(4)-2B, <br />and Appendix 2.05.3(4)-8. Designs presented in Appendix 2.05.3(4)-8 for NHN-002 North and <br />South Ditches supersede designs presented in Appendix 2.05.3(4)-1. <br />Sedimentation Ponds <br />Sediment pond design details are discussed in Appendix 2.05.3(4)-1 as well as Appendix <br />2.05.3(4)-8 for Pond NHN-002. Designs presented in Appendix 2.05.3(4)-8 supersede all Pond <br />Section 2.05.3(4) Page 2 April 2016 (PR -01) <br />