My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-26_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2017-05-26_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:27:07 PM
Creation date
5/30/2017 2:16:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
5/26/2017
Doc Name
Response To Application Consideration Notice
From
DWR
To
DRMS
Type & Sequence
AR4
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AVC © LORADO <br /> Division of Water Resources <br /> Department of Natural Resources <br /> Office of the State Engineer <br /> 1313 Sherman St, Suite 818 <br /> Denver, CO 80203 <br /> Response to Reclamation Permit Release Request Consideration <br /> DATE: May 26, 2017 <br /> DEICED <br /> T0: Timothy A. Crazier, Environmental Protection Specialist <br /> CC: Division 2 Office; District 12 Water Commissioner MAY 2 6 2017 <br /> FROM: Ivan Franco, P.E. W�( .-;,H�F RECLAMATION <br /> CLriMATION <br /> RE: Cresson Project, File No. M-1980-244 (AR04) AND SAFETY <br /> Operator: Cripple Creek Et Victor Gold Mining Company <br /> Contact: Cripple Creek Et Victor Gold Mining Company, (719) 689-4055 <br /> Sec. 30, Twp. 15S, Rng. 69W, 61h P.M., Teller County <br /> CONDITIONS FOR APPROVAL <br /> ® The proposed operation does not anticipate exposing groundwater. Therefore, <br /> exposure of ground water must not occur during or after mining operations. If <br /> stormwater is contained on-site, it must infiltrate into the ground or be released to <br /> the natural stream system within 72 hours, or all work must cease until a substitute <br /> water supply plan, or augmentation plan approved by water court, is obtained. <br /> Reclamation plans must ensure water will not be retained onsite for more than 72 <br /> hours unless an augmentation plan approved by water court is obtained. <br /> COMMENTS: N/A <br /> 'pF-�UCCj� <br /> htly;�*P <br /> \94; <br /> 1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866,3581 F 303.866.3589 www.water.state.co.us i� o <br />
The URL can be used to link to this page
Your browser does not support the video tag.