My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-24_REPORT - M2001005
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001005
>
2017-05-24_REPORT - M2001005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 11:15:24 AM
Creation date
5/26/2017 1:22:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
REPORT
Doc Date
5/24/2017
Doc Name
Annual Fee/Report/Map
From
Continental Materials
To
DRMS
Annual Report Year
2016
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
112c Annual Report <br /> Permit Number: M-20014)05 <br /> RECEIVED Permitlee Name: Continental Materials Corporation <br /> Operation Name: Grisenti Farms Gravel Pit <br /> MAY 2 4 2017 County: I•remont — <br /> DIVISIUi% e(ECr_AMATION, Anniversary Date: May 23,2017 <br /> L$ Current Bond Amt: $115,000,00 <br /> FEE EPOR7r Annual Fee Due: $791.00 <br /> Permit Acreage: 115.30 <br /> (URMS Office Use Only) DRMS Specialist TC1 <br /> According to C.R.S.34-32.5-116 or 34-32-116,each year,on the anniversary date of the permit,an operator shall submit <br /> the Annual Fee,an Annual Report and Map showing the extent of current disturbances to affected land_required monitoring <br /> infomtation,reclamation accomplished to date and during the preceding year,any new disturbance that is anticipated to <br /> occur during the upcoming year, any reclamation that will be performed during the upcoming year,the dates for the <br /> beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If.while completing this report.you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enl'orcentent action. <br /> I. Is the site identification sign posted in accordance with Rule 3.1.12(1)? NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YL•S Q <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 2017 <br /> 4. What was the date of last excavation;processing or hauling activity at the mine? <br /> 5. Does the mine operate more than 180 days per year? NO <br /> If'-NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES <br /> ED <br /> b)approval for INTERMITTENT OPERATION? YES <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation): +- 101.6 acres <br /> The last AR did not include the Phase 1 Lake area.) <br /> 8. Number of acres that were newly affected during the current report year: 0.0 <br /> (The area was previously stripped of topsoil.) 1.0 <br /> 9. Number of acres that were reclaimed during the current report year: (back-filled) <br /> 0.0 <br /> 10. Estimated new acreage to be atl'ected in the next report year: <br /> 11. Estimated acres to be reclaimed in the next report year: ($ackfillin2) — 5.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.