My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-05_REVISION - M1983090 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983090
>
2012-07-05_REVISION - M1983090 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:29:50 PM
Creation date
5/26/2017 1:19:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983090
IBM Index Class Name
REVISION
Doc Date
7/5/2012
Doc Name
Application
From
Bestway
To
DRMS
Type & Sequence
SO6
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> IV. RECITALS <br /> 1. On J t.O'LQ- Z(o ,�Permit Number m-AA 5 - C>90 was granted to <br /> kl4e., (,Derafai (existing operator)("Permittee"),pursuant to which <br /> Permittee has been conducting a mining operation in the County of Lie l8 ,State of Colorado. <br /> 2. Permittee wishes to assign the permit to ES3, LAB-, (-p "Ae a �✓uC (new <br /> operator),as Successor Operator("Successor")and Successor wishes to become Successor P rmittee under the <br /> permit. <br /> 3. Successor understands that the reclamation plan(the"Plan")required by the permit and by applicable <br /> State laws and regulations has not been completed and is willing to assume full responsibility for the completion of <br /> the Plan. <br /> V. AGREEMENTS <br /> Permittee and Successor hereby agree,for their own benefit and for the benefit of the State,such agreements to be <br /> effective ipso facto upon the approval by the State of the transfer of the Permit from Permittee to Successor,as <br /> follows: <br /> 1. Successor has inspected the mining and reclamation operations to its entire satisfaction and is fully aware <br /> of the conditions thereof. Successor understands and accepts all of the conditions of the Permit. <br /> 2. Successor will complete the reclamation plan,and hereby assumes liability for completing such plan as to <br /> all areas heretofore disturbed, as well as to all areas hereafter disturbed. Successor will perform all of the <br /> obligations of the Permittee under the Permit which have not heretofore been performed by Permittee. <br /> 3. Successor hereby tenders to the State its attached Performance and Financial Warranties*,which are to be <br /> substituted for the Performance and Financial Warranties heretofore filed by the Permittee,effective upon the <br /> release of the latter Warranties. <br /> 4. Successor represents to the State that,to the best of its knowledge,information and belief,it is not in <br /> violation of any of the provisions of the Colorado Mined Land reclamation Act with respect to any other operation <br /> conducted by it in the State of Colorado. <br /> Permittee and Successor hereby request the State to consent to the assignment of the Permit, to recognize <br /> Successor as Successor Operator under the Permit,and to accept the tendered substitute Performance and Financial <br /> Warranties in place of the Warranties presently on file with the State. <br />
The URL can be used to link to this page
Your browser does not support the video tag.