My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-25_REPORT - M1977210
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977210
>
2017-05-25_REPORT - M1977210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 11:47:07 AM
Creation date
5/26/2017 1:17:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
REPORT
Doc Date
5/25/2017
Doc Name
Annual Fee/Report/Map
From
Continental Materials
To
DRMS
Annual Report Year
2016
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Total acres in various stages of reclamation,wince permitted mining actiN itics began: <br /> Total acres Total acres Tutal acres Total acres <br /> bacMilled: 8 ;5 ceeded w/ 5.35 w/topsoil S 15 mulched w/ NA <br /> approved mix: replaced- approved muleh: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 8.35 fertilized w/ NA replacement 61, rate(tons/ac): N;±, <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application application NA application N3 <br /> Broadcast <br /> method: method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? NO N/A <br /> If"YES",indicate the weed species,control area,control type,application rate and treatment date on the report map. <br /> (Please see attached documents) <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? YES © N/A <br /> If"NO",please explain: (The permit application suggests fines may be used.but recounnends topsoil.) <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? NO NIA <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater,is the site in compliance with the approved mining plan and Office of the State <br /> Engineer(Well Permit,S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO <br /> 17. Are all hazardous materials stored within approved spill containment structures? NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? ®E NO N/A <br /> 19. Is your basis for legal right to enter still valid'? �D NO <br /> 20. Does your permit require you to submit monitoring information annually? YL•S (0 N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary.current affected area boundary and location of the acreages specified in items 7-12 and 14. UPDATED <br /> MAP ATTACHED: Yes <br />
The URL can be used to link to this page
Your browser does not support the video tag.