Laserfiche WebLink
Annual Report Map: <br /> Note: All boundaries, figures and other features are not based on survey data. <br /> The approved reclamation plan allows for the use of moported soil and crusher fines <br /> as a topsoil substitute. <br /> North <br /> Permit Boundmm• <br /> (Approximate) <br /> :approximate limit. �----Legend _-----y 1 <br /> ; 0 Datatica <br /> f _—— of mintnpp i <br /> i --- i <br /> l L aum <br /> Slide p <br /> esxias <br /> Area pV�A>!a <br /> 0 ess <br /> Active topsoil <br /> \ stoclpile <br /> Affected Area kPPro�a e) Scale Office <br /> Note:Active training is also <br /> occurring around the slide area <br /> Active Nfin�ns area. <br /> in areas that are stable_ <br /> Continental Materials Corp.,Permittee <br /> Transit\fix Concrete Co.,Operator <br /> Pikeview Quarry M1977-2111/ <br /> Scale; 1 inch=688 feet File: Pikeview Quarry.ndp <br /> MAY 2 5 2017 <br /> 5 Page <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br />