Laserfiche WebLink
Quarter Mile Off-Lease Permit Boundary (continued) <br /> T.1 S., R.98W., 6th P.M. <br /> Sec. 7, SE'/SE'/ <br /> Sec. 8, S%2S%2 <br /> Sec. 9, S'hS'/2 <br /> Sec. 10, S'/2S'/2 <br /> Sec. 11, Lots 5 to 8, inclusive <br /> Sec. 12, Lots 13 to 16, inclusive <br /> Sec. 15, N'/2N W'/; SW'/N W'/ <br /> Sec. 16, S'/2S E'/; N E'/SE%; S E'/N E'/ <br /> Sec. 18, E'/2E'/2 <br /> Sec. 19, N E'/N E'/ <br /> Sec. 20, N'/2NW'/; W%2NE%; SE%NE'/a; E'/2SE% <br /> Sec. 21, N W'/SW'/; S%2N W'/; N E'/NW'/; NW'/N E'/ <br /> Sec. 29, N%2SW%; NW'/4SE'/a; W'/2NE%; NE%NE% <br /> Sec. 30, E'/2SE'/ <br /> Sec. 31, NE'/NE% <br /> Sec. 32, N'/2N'/2; SE%NE%; E'/2SE'/ <br /> Sec. 34, Lots 1, 2, 7, 8; W%2SW'/; NE'/SW'/; NW'/SE'/ <br /> Sec. 35, Lots 5 to 8, inclusive <br /> Sec. 36, Lots 1 to 5, inclusive <br /> T.2S., R.98W., 6th P.M. <br /> Sec. 3, Lot 4 <br /> Sec. 4, Lots 5 to 8, inclusive <br /> Sec. 5, Lot 1 <br /> The area described contains 3,868.94 acres, more or less. <br /> The principal location of the operation is: T.1 S., R.98W., Sections 22-27. The <br /> original access road crossed portions of Sections 25, 26, 35 and 36 of T.1 S., R.98W; <br /> Section 31 of T.1 S., R.97W.; and Section 6 of T.2S., R.97W. This road is now Rio <br /> Blanco County Road (C.R.) 31. Figure 2-1 shows the four sodium lease tracts and <br /> affected areas from project development. Figure 2-2 is a detailed well location map <br /> of the Mine Area.7 When required, Natural Soda installs wells off-lease to more <br /> effectively mine the nahcolite within their sodium leases. These off-lease and <br /> locations and surface hole locations are within '/ mile of the lease boundary. The <br /> Quarter Mile Off-Lease Permit Boundary was added to accommodate off-lease <br /> surface hole locations.8 <br /> 'Revised December 2015 <br /> 8 Revised April 2017 <br /> Daub&Associates, Inc. Page 2-3 2015 NS Mine Plan Modification <br /> 4/18/2017 Section 2 General Information <br />