My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-23_REVISION - P2016020
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2016020
>
2017-05-23_REVISION - P2016020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:36:16 AM
Creation date
5/24/2017 1:25:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016020
IBM Index Class Name
REVISION
Doc Date
5/23/2017
Doc Name
Request For Amendment To Permit
From
Joe Harrington
To
DRMS
Type & Sequence
MD1
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Other Disturbances (please describe) <br /> None <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> gas, diesel, drilling polymer, bentonitic drill mud, hydrochloric acid. Gas in vehicle tanks, diesel in double <br /> contained 2,500 gallon storage tank. Drill fluids in sealed buckets and or bags Portable toilet to be located <br /> on-site from rental company near drilling operation. HCI (up to 40 tons) may be used to acidize wells <br /> (isolated to only contact the Leadville and lower formations)after completion of drilling to remove lime scale <br /> from water bearing crossfaults. HCl will be contained in delivery tanker until diluted directly for injection to a <br /> 2-5% concentration at the wellhead. <br /> G. New Roads: <br /> Length (ft): 0 Width (ft): 0 <br /> Significantly <br /> Upgraded Roads Length (ft): 1500 Width (ft): 8 <br /> Are culverts or other crossings proposed? If so,please describe: <br /> Maintain or improve existing culverts on road from Extension tunnel to drill pad located <br /> meediate+y-east-e#-1=eanh Well <br /> We,ll <br /> H. Total project area to be disturbed (acres) 0.8 <br /> I. Describe the equipment to be used for the prospecting operations: <br /> Schramm T200XD <br /> smell dozer for read <br /> _imnrOye rnent <br /> 10OKW diesel generator <br /> 350 BBL custom mud tank. 900GPM desander/desilter mud cleaner system <br /> Form 2—Public File Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.