Laserfiche WebLink
Table D-2 Worst Case Reclamation Costs <br /> Activity Description Time Months Cost $ <br /> Grading sediment pond pad to final slopes. 0.25 3000 <br /> Spreading 12 inches of topsoil over Stage 1, sediment pond <br /> area, and Usable Pad Area 0.25 5711 <br /> Backfilling portal 0.5 593 <br /> Backfill secondary escapeway portal 0.5 355 <br /> Install steel doors 0.1 2000 <br /> Seed to soiled areas 0.25 708 <br /> Disk to soiled areas 0.1 354 <br /> Mulch seeded areas 0.25 1180 <br /> Haul all facility sea cans offsite 0.25 3000 <br /> Totals 2.5 16901 <br /> DRMS Costs 28%x direct costs 4,732 <br /> Total Bond Amount 21,633 <br /> Detroit City Mine February 2017 D4 <br />