Laserfiche WebLink
M0C--' <br /> Xv-Greg Lewicki And Associates, PLIX <br /> 3375 West 1 oii ers Circle Littleton, CO 80123 <br /> RECEIVED <br /> May 18, 2017 v MAY 19 2017 <br /> Michael Cunningham DIVISION OF RECLAMATION <br /> Colorado Division of Reclamation, Mining, and Safety WNWG AND sAFETY <br /> 1313 Sherman St, Room 215 <br /> Denver, CO 80203 <br /> RE: Detroit City Mine; DRMS File No.M-2017-003; Adequacy Response 2 <br /> Dear Mr. Cunningham <br /> Colorado Calumet Co, Inc. has assembled the following responses to the adequacy questions posed <br /> in the Division's May 8t'letter. Each of the items has been addressed in line,with revised permit <br /> components, such as maps, listed in a table at the end of the letter. <br /> 1. The Division intends to conduct a pre-operation inspection of the site prior to approval of <br /> the 110(1)Reclamation Permit Application. If weather conditions prohibit an inspection of <br /> the site prior to approval, then an inspection of the site will be scheduled as soon as <br /> weather conditions allow. <br /> Noted. <br /> 2. The Applicant submitted a Certified Mail Receipt as proof of notice to owners of record of all <br /> land surface within 200 feet of the boundary of the affected land.Pursuant to Rule 1.6.2(e), <br /> proof of notice must be in the form of a return receipt of Certified Mailing.Please submit a <br /> return receipt of Certified Mailing as proof of notice to land owners within 200 feet of the <br /> boundary of the affected land. <br /> See the attached return receipt. <br /> 63.2 Exhibit C—Mining Plan <br /> 3. The Applicant has stated the secondary escapeway will be via an existing portal. Please <br /> provide the dimensions of the portal to be used for the secondary escapeway and describe <br /> any existing closures present at the escapeway. In addition, describe how the secondary <br /> escapeway will be closed during final reclamation and include all costs associated with <br /> final closure in the financial warranty cost estimate. <br /> The secondary escapeway is similar to the main portal,but smaller(6'x 8'). It will be backfilled <br /> similar to the portal. See the revised page D-3 for details. <br /> 1 <br />