Fish Creek Ventilation Shaft and Dewatering and Water Treatment Installation (MR07-216) - The Fish Creek <br />Ventilation installation had a useful life of approximately seven years, until the first set of longwall panels were <br />mined -out. The fan building, duct -work, and fan have been removed from the site. The borehole was temporarily <br />sealed, as described in the response to Rule 2.05.4(2)(g), and was used only for discharge from the excess flow <br />diversion line from the Fish Creek water treatment system. In 2007, the shaft installation was modified for use as a <br />dewatering well to replace the inoperable Fish Creek South Dewatering Borehole. <br />On completion of mining, and when the system is no longer required, all facilities will be removed and the site <br />reclaimed. Removal of the surface facilities will involve removal of the modular electro -coagulation units (2); <br />dismantling of surface structures, which includes the powerline, transformer and pad, any remaining chemical and <br />pump control equipment, buildings and pads; fencing,; stubbing -off and capping buried piping; and demolition of <br />building foundations. The concrete demolition debris will either be hauled to the refuse site for disposal or hauled to <br />a landfill. <br />Final reclamation of the dewatering wells and ventilation shaft will involve excavating down 4 feet from grade <br />around the casing, cutting off the steel casing 3 feet below grade, hanging steel decking from the top of the cut-off <br />casing (this decking will be 30 feet below the top of the cut-off casing), placement of 30 feet of concrete in the <br />casing (for a 3 -foot diameter cased hole, the 30 foot x 3 foot diameter cement plug would weigh approximately <br />32,000 pounds, which would be more than adequate to resist the calculated hydrostatic pressure and provide an <br />effective seal). The remaining 3 feet will be filled with soil, and graded to blend with the surrounding terrain. . The <br />access road will be graded to blend with the surrounding terrain, and the culvert will be removed. The entire area <br />will be topsoiled and seeded with the appropriate seed mixture. <br />After the facilities are removed, the site will be regraded to blend with the existing terrain and the stockpiled topsoil <br />redistributed over the area. The soil material stored adjacent to the site will be redistributed over the dewatering site <br />and reclaimed road segments will be seeded with the pastureland seed mixture. Approved permanent access roads will <br />remain intact for use by the surface owner. During the 10 -year liability period, TCC will maintain the road for <br />monitoring purposes. After bond release, the land owner will assume responsibility for the road. The northern short <br />section (2,500 feet) of the access road will be reclaimed unless otherwise approved by the CDRMS. The soil <br />windrowed or stockpiled adjacent to the road will be seeded with the rangeland seed mixture. <br />Rockdust Tank - After removal of the rock -dust tank and cement pad, the pit -run gravel of the truck access/unloading <br />area will be dispersed across the .5 acres of disturbance. The area will be ripped before the stockpiled soil is reapplied <br />and reseeded. <br />7 -North Escape Shaft - When the facility is no longer required, the shaft will be plugged and the site graded, re -soiled, <br />and revegetated. Steps required to abandon the shaft will include removal of surface structures, demolition of the <br />concrete foundation and piers, and sealing of shaft. After the surface structure is removed, the broken -up foundation <br />and piers will be put down the shaft, and decking will be suspended in the shaft 10 feet below -grade. The support <br />beams and decking will be suspended from the steel casing by steel straps (i.e. i -beams or similar support structures) <br />welded to the support beams. The steel straps will be welded to the existing 48 -inch diameter casing. Once this is <br />completed, a 24 -inch thick reinforced concrete slab will be poured in-place over the previously placed decking. The <br />void from the top of the concrete slab to within 5 feet of the surface will be backfilled with inert fill material <br />(approximately 1.4 CY) from the surrounding area. The next 2 feet of the shaft will then be filled with concrete to <br />form a surface plug for the shaft. Suitable fill material will be placed in the remaining 3 feet of the shaft <br />(approximately 1.4 CY), and then the site will be re -soiled and revegetated. The redistributed soil will be seeded <br />with the pastureland seed mixture. <br />NM) Power Borehole - Upon completion of mining, and when the power borehole is no longer needed, the facilities <br />will be removed and the site reclaimed. Removal of the surface facilities will involve dismantling of surface structures, <br />which includes the powerline, transformer and pad, road and culvert, and building. After the facilities are removed, the <br />site will be regraded to blend with the existing terrain, the stockpiled soil will be redistributed over the area, and the <br />power borehole pad and reclaimed road segments will be seeded with the pastureland seed mixture. The entire road <br />will be chisel -plowed after removing the geotextile. <br />MR 16-296 2.05— 106.2 05/10/16 <br />