10
<br /> 19 RT MINE DEWATEPJNG M A P LEGEND
<br /> BOREHOLE
<br /> PROPOED BOREHOLE
<br /> LOCATION O 15
<br /> REVISION DATE BY DRAWN BY
<br /> r
<br /> TR I i -078 08/0 I J I I KEG BY DATE
<br /> (w> !
<br /> dl MR 1 1 -258 1 O/2G/ I I KEG KEC 1/7/98
<br /> 1
<br /> MR 14-253 10/08/ 1 1 KEG
<br /> MR 1 5-291 12/ 18/ 15 KEG SCALE: 1 "=600'
<br /> j
<br /> MR I G-297 05/1 I/ I G KEC
<br /> TR 17-67 03/ 14/ 17 KEC TOWNSHIP
<br /> i t PROPOSED T 5 N
<br /> WCO 14 19 RT DEWATERING ❑ WCO22
<br /> PIPELINE
<br /> WCO I G RANGE
<br /> 17 R 8G W
<br /> "•1AIN NORTH VENTILATION SHAFT IN5TAL!ATION V
<br /> -- d
<br /> BULK MATERIAL ROCKDU5T BOREHOLE RDBH 1, MICHAEL ANTHONY BEROIN'E, A REGISTERED PROFESSIONAL ENGINEER
<br /> I I BOREHOLE BMBH WATER BOREHOLF WBH
<br /> AIR BOREHOLE ABH PROPOSED 0 IN THE STATE OF COLORADO DO HEREBY CERTIFY THAT THIS MAP 15
<br /> G MAIN NORTH DIVER5ION DITCH 19 RT MINE DEWATERING
<br /> VENTILATION / POWERLINE WC017 CORRECT TO THE BEST OF MY KNOWLEDGE LIEF.
<br /> SHAFT / SUBSTAT{ON
<br /> ���Es) e,N�9_ t/�F
<br /> 5 MAIN NORTH Qom,.""N7Hp �G
<br /> 2--MENT BOREHO:F O
<br /> DIVERSION DITCH 10 CMP R15ER
<br /> WCO
<br /> 0 ACCESS ROAD 5 MN CEMENT I �` 3 4706418
<br /> ------ BOREHOLE PAD C7
<br /> TOPSOIL STOCKPILE WCO �\ '` — s'., 200Sx200' 9:� n.
<br /> 8950 YD3 TOPSOIL STOCKPILE __ -BOREHOLE
<br /> I TOP501L5TOCKPI MICHAEL ANTHONY BERDINE ��Fss_, D I O'CM YD3 /ANAL EN
<br /> 10'CMP RISER 1 O'CMP RISER— �_ 10`CMP �__I 1950 Y03 P.E. NO. 470G4
<br /> \ RISER PUMP STATION
<br /> " POWERLINE WCo 19R
<br /> STOCK POND ACCESS PAD SHAFT LOCATION
<br /> 1 800' I O AND LIGHT LOCATION or
<br /> E
<br /> USE ROADFAN SILENCER
<br /> HDPE PIPELINE "
<br /> GMN STORAGE RESERVOIR WATERLINE/ T IL STOCKPILES
<br /> 50FT PIPELINE DISTURBANCE CORRIDOR 1 CY(PAD)
<br /> _ �.--- --- . WCO27
<br /> WCo 18R
<br /> WC010
<br /> \, I TOPSOIL STOCKPILES WCO29
<br /> \, 1,100 YD3 (ROAD) •
<br /> UPGRADE EXISTING CMP PIPE /i AND GMN SSHA TO 5MN
<br /> FT SITES MATCH' LINE SHEET 2 OF 2 WCO2GG
<br /> FROM I8' TO 24' DIAMETER ! \
<br /> —100' IN LENGTH \ '\ MATCH LINE SHEET I OF 2 WCO2Gf
<br /> `tit• \ Eo
<br /> TOPSOIL STOCKPILE1 J >>\ \\ EXISTING RANCH ROAD WCO GE
<br /> 1 RUNOFF DIVERSION f ACCESS ROAD \
<br /> TOPSOIL STOCKPILE WCO2GB
<br /> DITCH WITH ROCK �LENGTH = 2550' �. �' . 2 90p CY(PAD) �G
<br /> A CHECK DAMS \ ACCESS ROADS �-
<br /> 13 ACRE
<br /> UTILITY BH \ WC009
<br /> • I ACRE PAD SURFACE
<br /> TRANSFORMER E20343.03 �� F
<br /> WCO 1 2 10 RT DEWATER;NG BOREHOLE IN5TALLATIC
<br /> PAD SURFACE ELFV. G744'
<br /> CUTTINGS TOPSOIL 23 �� FLOORELEV. 5477' ;� r
<br /> PONDS t PILE 13,550 CY BH DEPTH = 1257' TOPSOIL STOCKPILES ~ TOP501L STOCKPILE
<br /> j 2,800 YD3 (ROAD) 7,450 CY
<br /> DRILL P D—. ,_- 20 ` 1 �!
<br /> _.
<br /> 10 RT DEWATERING � li
<br /> SEDIMENT ND5<=
<br /> „Y..- I8 LEFT BOREHOLE WATERLINE r LEGEND
<br /> > WATERLINE ACCE55 ROAD
<br /> 14" HDPE PIPELINE �r_(PRE-EX15T1NG
<br /> r RANCH ROAD)
<br /> i AREAS WHICH TCC 15 RESPONSIBLE FOR
<br /> SEEDED 2013
<br /> 7.s ACRES I, FINAL RECLAMATION
<br /> TOP501L
<br /> I s LT BoeEHOLE i VENT LArION SHAFT � '
<br /> /PILE (2G00 YD3) TOPSOIL TOCKPILE
<br /> FI H CKLEK DEWATERING 50 C� BARRICADE CHAMBER " - -`> � AREAS WHICH RAILROAD 15 RESPONSIBLE FOR
<br /> ( 7 NORTH ESCAPE SHAFT) ' FINAL RECLAMATION
<br /> TO SOIL STOCKPILE TRAN5F ER ACCESS ROAD
<br /> 5 YD3 PCB-3 TOPSOIL STOCKPILE ' 1 0 AREAS WHERE VARIANCE FROM CONTEMPORANEOUS
<br /> OG TO SOIL STOCKPILE 2,200 YD3
<br /> 3 2 5 YD3 FCB- �
<br /> I
<br /> BARRICADE AccEss sHar� wco I; RECLAMATION HAS BEEN APPROVED FOR COMBINED
<br /> 2014 a O� 0.5 ACRES r-7 EXISTING /
<br /> SURFACE AND UNDERGROUND OPERATIONS
<br /> (4.2 ACRES) 'z D A7EwNG BORER RA CH ROAD o � ( RULE 2.0G7 ) OR FACILITIES WERE TRANSFERRED
<br /> d TO 501E STOCKPILE" l4,)'�'m4 OSH CREEK TER TREATMENT FACILITY
<br /> ELECTRICAL BOREHOLE (PLUGGED)
<br /> 7,4 YD3 FCB-I - UNDER NEW PERMIT.
<br /> CORD.#33
<br /> SEEDED 200
<br /> TO 501L STOCKPILE
<br /> 2014 35 YD3 FCVF-I
<br /> 7.0 ACRES SUBSTATION w
<br /> O.1 ACRE
<br /> AERIAL SPRAY AREA -- TOP501L STOCKPILE �.f AREAS RECLAIMED
<br /> SEEDED 2002 =
<br /> (280 ACRES) FISH CREEK SETTLING POND 1,100 YD3 555-I
<br /> ,r TOP501L STOCKPILE AREAS OF WEED CONTROL 2014
<br /> 900 YD3 555-I
<br /> fly ( ALSO SEE LISTED AREAS )
<br /> o� f.111 AREAS OF RECLAMATION 2014
<br /> �A � ACCESS ROAD ACCESS ROAD G RT THICKENER UN RFLOW �
<br /> ERIA (PRE-EXISTING (PRE-EXISTING BOREHOLE
<br /> AERIAL SPRAY AREA I
<br /> RANCH ROAD) /% RANCH ROAD) LIGHT USE AREAS Of TEMPORARY SEEDING 2014
<br /> TOP501L STOCKPILES (340 ACRES) ��
<br /> 10,900 CY TROUT TEST 55�NDSTONE ROAD
<br /> o i000 zaoo
<br /> RECLAIMED EDED D�DRRILLPAS r STREAM BUFFER ZONE ( I Off' )
<br /> / / 1 .2 ACRES _
<br /> G LT UTILITY BOREHOLE 2 6 25 27
<br /> rf - BOREHOLE Q STREAM BUFFER ZONE VARIANCE
<br /> 29 VV -5 O __-POND G DITCH EXTENSION (J
<br /> �✓ 0.3 ACRES
<br /> roPsolLSTOCKPILE W 0 DRILL HOLE LOCATION
<br /> r- G RT PIPELINE
<br /> F� -- D15TURBANC
<br /> 12012 ( 5.8 ACRES)
<br /> FOIDEL SCHOOL II 1 `" MINE ENTRANCE
<br /> #OUT BUILDING + ! I I ND G
<br /> i. _SE TAN,
<br /> "
<br /> /C/Y/ ff�}{ I; TOPSOIL 57 CKPI LE
<br /> I O , 54,850 YD3 F-I
<br /> ff 1,•i t i
<br /> ///%800GY �� �TOPSOIL5T KPILE
<br /> ;,f �, OND F
<br /> HICKENER UNDERFLOW (E ,2,200 CY S -I G
<br /> � �
<br /> URFACE BOREHOLE PAD
<br /> PROTECTIVE BERM SF-15 i
<br /> OPTION 2 SEEDED I995
<br /> j
<br /> R TREATMENT
<br /> COAL FINES v FACILITY
<br /> i JJJ -
<br /> SEEDED t995; AC INERES TRPILE E I , IJ`ACCE55/HAULRQAD 0
<br /> S30
<br /> o
<br /> --- � 'I
<br /> a SEEDED 19 G EMS RANCH ROAD 27.3 ACRES TOP501L RAt CAD �� / OP O F ,Ck i t I>Iv I I C{ � I_
<br /> 1.2 ACRES L STOCKPILE W H
<br /> F , , 100 CY 5F-I 1,
<br /> PLA
<br /> 5OUTHWE5T VE ILATION SHAFT �_.,_` t EXISTING SANDSTONE SUB PAD TIE-IN LOCATION OFFICE ILER
<br /> TRANSFORMER, i�1
<br /> BOREHOLE - , 1'
<br /> PROTECTIVE BERM 0008V OFFICE BATHHOUSE
<br /> SEEDED 1995 1,� OP�Yt? G V 14
<br /> �'-„^�✓�FIAL1"�
<br /> /- i 7 / j I f J - TOPSOIL STOCKPILE
<br /> 700 CY SF S ) i � 1 I ( ; ` FAN 55,850 CY 5r�2
<br /> MINE ENTRANCE PORTAL.
<br /> r / I
<br /> I ICY�t"! PROPOSED SOIL STOCKPILE 30 PT HIGH
<br /> Jh 6 —4.5 ACRES - 200,000 CY
<br /> I '" ` TEMPORARY CUTTINGS STORAGE AREA
<br /> I TOP501L STOCKPILE- ( i 1 \, \ t 32
<br /> 2
<br /> 900 CY 5F-17 + CRDA FIRST BENCH J I
<br /> h' P50IL 2014 (3.0 ACRES )
<br /> y�/ 1 ,000 CY COAL REFUSE DISPOSAL
<br /> TOP501L STOCKPILE RAMP Y I jl1 1 i jr VER NW SLOPE CRDA AREA EXPAN510N area Of interest
<br /> 87 4,100 CY 5F-8 I� if 111 EXISTING 5AMPLE 5,000 CY 2012 (4.7 )
<br /> TOP501L STOCKPILE
<br /> i 111I11 1 BUILDING / % TO SOIL STOCKPILE
<br /> 15 ,200 CY 5F 6
<br /> 109,700 CY 5F-3
<br /> BELT OUT BACK �,L SITE
<br /> (BOB)
<br /> DT �;,.�
<br /> 70P50IL 5 KPILE E � 0 � "'���� COVER MATERIAL
<br /> 38,700 SF-7 STOCKPILE(CRDA-C2 ) ��
<br /> 123,800 CY ��5!!!
<br /> EXPLOSIVES BUNKER LOCATION 4 `
<br /> ACRES) TOPSOIL STOCKPILE
<br /> 4
<br /> i 131,800 CY (CRDA 52 > Twentymile Coal LLC
<br /> f
<br /> TOPSOIL STOCKPILE �l /i S �"'_5 _� �_ Po**
<br /> 29515 Routt Co. Rd. # 27
<br /> 5,800 CY 5F-9 r/ ���
<br /> Oak Creek, CO $1639
<br /> ` TOPSOIL STOCKPILE
<br /> 1.
<br /> 350 CY SF 10 T.-. 4__6
<br /> k i ,.. SF-I4
<br /> S ^ ACCE55 ROAD TOPSOIL STOCKPILE
<br /> COVER MATERIAL 20,000 CY
<br /> ' STOCKPILE ( CRDA-C I ) FOIDEL CREEK MINE
<br /> TOP501L STOCKPILE � �� �
<br /> POND A 4,900 CY (CRDA S 1 ) �
<br /> MAR l� ZQ1
<br /> Division of Reclamation, RECLAMATION MAP
<br /> Mining&Safety
<br /> O� Seam: Surface Country: USA
<br /> ^� ✓ 1 O Date: 10/08/14
<br /> 1 l brawn By: KEC State: Colorado
<br /> 1 ( SCALE: 1"= 800' 0 15W 3"'
<br /> TR-87
<br /> Approved 5/18117
<br />
|