Laserfiche WebLink
2. Waste Water <br />Sewage from the existing and proposed buildings will be disposed of through proposed and <br />existing sanitary sewer lines discharging into a sewer main on Lincoln Street which is owned by <br />the Nucla Sanitary District. Waste water from the equipment wash will be run through a <br />sediment trap and an oil water separator and discharged to Pond 018 via a natural drainage. <br />3. Domestic Water <br />Potable water will be provided through a water line tied into the Town of Nucla water system. <br />4. Solid Wastes <br />Solid waste will be picked up by the local waste disposal contractor for disposal in the Montrose <br />County Sanitary Landfill. The land fill is privately owned and operates under the regulations <br />mandated by the State of Colorado and Montrose County. Solid wastes not suitable for disposal <br />at the landfill will be transported to and disposed of in suitable, licensed facilities under the <br />applicable Federal and State regulations. When practicable, solid wastes will be separated for <br />recycling. <br />S. Explosive Storage <br />No explosive storage facilities are contemplated for the New Horizon Mine. Blasting will be <br />carried out by a licensed independent contractor who will own and maintain explosive storage <br />facilities off-site and transport explosives to the mine site as needed. The contractor may <br />maintain small field magazines on the mine site, but no explosives will be stored at the mine <br />overnight. <br />6. Fuel Storage <br />Two above -ground fuel tanks will be utilized. One tank of approximately 13,000 gallons <br />capacity will be used for diesel storage and a tank of approximately 1,000 gallons capacity will <br />be used for gasoline storage. The diesel tank and the gasoline tank are located at the fuel and <br />lubricant storage and dispensing facility proximal to the truck shop. The tanks are enclosed by <br />berms and have spill prevention and safety protection devices as mandated by the appropriate <br />regulatory authorities. Spill prevention and containment measures will be implemented under the <br />New Horizon Mine Spill Prevention Control and Counter-measure (SPCC) Plan. <br />7. Coal Handling Structures <br />Section 2.05.3(3) Page 40 February 2017 (TR -78) <br />