Laserfiche WebLink
given in Attachment 2.05.3(3)-8 Montrose County Agreements. The plans as shown meet the <br />County road specifications as collector roads. <br />BB Road West of 2700 Road (Enstrom, Wilcox, and Johnson access) will be restored as well, <br />however it will be restored as the dirt road that existed prior to mine disturbance. Please see Map <br />2.05.3(3)-8 for details on the typical cross section of BB Road West of 2700 Road. The width of <br />the road in this section will be 26' wide when restoration is completed. A compacted fill surface <br />similar to the pre-existing condition will be restored. As indicated on Map 2.05.3(3)-8. Montrose <br />County has requested that a 24" CMP be installed at stations 0+75 and 6+21. The SEDCAD <br />calculations for these culverts are provided in Attachment 2.05.3(3)-27. <br />There will not be any special requirements which will be a part of the restoration of the Sunshine <br />Ranch Corner. This intersection will be restored in the same fashion as the adjacent county roads <br />and will be restored to county standards. The only thing special about the restoration of this <br />intersection is that there will be a stop sign in the direction opposing 2700 Road (BB Road), <br />which will allow 2700 Road to be the main through road. There are no special County <br />requirements for the restoration of this intersection. <br />Section 2.05.3(3) Page 37 February 2017 (TR -78) <br />