My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-18_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2017-05-18_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 1:43:54 AM
Creation date
5/19/2017 9:01:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
5/18/2017
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Type & Sequence
TR81
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> High Grade Mill Secondary Containment Modification <br /> NewFields Job No.475.0106.013 <br /> Week Ending Saturday,April 1,2017 <br /> 2.0 NEWFIELDS ACTIVITIES <br /> A Newfields representative was onsite on Tuesday March 31, 2017 to observe construction <br /> activities and inspect any installed containment upgrades. All work activities observed were <br /> performed in accordance with design drawings and project specifications. <br /> 3.0 MEETINGS AND COMMUNICATIONS <br /> Spoke with Steve Blaskovich about project progress and scheduling. Steve stated construction <br /> should be finished in the next two weeks and that he would call and schedule a final inspection <br /> for the project. The as-built drawings were also discussed and it was understood that they will <br /> be submitted to Newmont upon project completion and after the final inspection is performed. <br /> Spoke with Troy from Schmueser and Associates about project activities, scheduling, and <br /> materials. <br /> 4.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> None. <br /> 5.0 PHOTOGRAPHS <br /> g <br /> tw b <br /> c <br /> March 31, 2017—Silicon Installation (1DH) <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.