Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> High Grade Mill Secondary Containment Modification <br /> NewFields Job No.475.0106.013 <br /> Week Ending Saturday,April 1,2017 <br /> 2.0 NEWFIELDS ACTIVITIES <br /> A Newfields representative was onsite on Tuesday March 31, 2017 to observe construction <br /> activities and inspect any installed containment upgrades. All work activities observed were <br /> performed in accordance with design drawings and project specifications. <br /> 3.0 MEETINGS AND COMMUNICATIONS <br /> Spoke with Steve Blaskovich about project progress and scheduling. Steve stated construction <br /> should be finished in the next two weeks and that he would call and schedule a final inspection <br /> for the project. The as-built drawings were also discussed and it was understood that they will <br /> be submitted to Newmont upon project completion and after the final inspection is performed. <br /> Spoke with Troy from Schmueser and Associates about project activities, scheduling, and <br /> materials. <br /> 4.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> None. <br /> 5.0 PHOTOGRAPHS <br /> g <br /> tw b <br /> c <br /> March 31, 2017—Silicon Installation (1DH) <br /> Page 2 <br />