Laserfiche WebLink
6.4.5 EXHIBIT E - Reclamation Plan <br /> The Pit Area, Processing Plant & Product Stockpile Area, Access Area, and Spoils & Stockpile Area will <br /> all be revegetated except for that portion of the reservoir below the high water line. See Map 5 for <br /> approximate finished contours of the reclaimed land The contours in the Spoils & Stockpile Area will be <br /> adjusted as needed based on the volume of excavation that is not removed from the site for road <br /> construction. All finished slopes will be 3H.1V or less steep and will be shaped to facilitate non-erosive <br /> drainage Revegetation will commence once mining operations are completed, mining equipment and <br /> stockpiles are removed, reservoir construction is completed, and the Spoils& Stockpile Area is contoured <br /> to facilitate drainage. <br /> The Revegetation Plan that the District will implement is provided in Attachment D. The planned post- <br /> reclamation use is grazing. A fence will be installed to keep cattle out of the reservoir and off the reservoir <br /> slopes <br /> 032 <br />